Getting electricity (DB16-20 methodology) - Score in South Korea
South Korea: Getting electricity (DB16-20 methodology) - Score was 99.89 in 2019. ▬ Flat
Getting electricity (DB16-20 methodology) - Score in South Korea, 2014–2019
Source: World Bank.
Analysis
The most recent figure for getting electricity (db16-20 methodology) - score in South Korea is 99.89, measured in 2019. That is the highest value across all 6 years on record.
That represents a change of up 0.0% over ten years.
That places South Korea 2nd out of 188 countries with data for 2019, putting it in the top 10%.
Countries ranked near South Korea
More private sector data for South Korea
- Merchandise trade 71.6% (2025)
- Food imports 6.3% (2024)
- Manufactures imports 60.1% (2024)
- Merchandise imports 631.89 billion current US$ (2025)
- Food exports 1.6% (2024)
- Manufactures exports 87.3% (2024)
- Merchandise exports 709.33 billion current US$ (2025)
- Commercial service exports 149.31 billion current US$ (2025)
- Transport services 19.5% (2025)
- Computer, communications and other services 57.4% (2025)
Frequently asked questions
- What is getting electricity (db16-20 methodology) - score in South Korea?
- Getting electricity (db16-20 methodology) - score in South Korea was 99.89 in 2019, according to the World Bank.
- What is the highest getting electricity (db16-20 methodology) - score recorded in South Korea?
- The highest recorded value was 99.89 in 2019.
- What is the lowest getting electricity (db16-20 methodology) - score recorded in South Korea?
- The lowest recorded value was 99.87 in 2014.
- How does South Korea rank for getting electricity (db16-20 methodology) - score?
- South Korea ranks 2nd out of 188 countries with data for 2019.
- Is getting electricity (db16-20 methodology) - score rising or falling in South Korea?
- Over the last ten years it is up 0.0%. The long-run trend across the full record is flat.
- Where does this South Korea data come from?
- The figures come from the World Bank, published as part of Getting electricity (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB16-20 studies.