Getting electricity (DB16-20 methodology) - Score in South Korea

South Korea: Getting electricity (DB16-20 methodology) - Score was 99.89 in 2019. ▬ Flat

Latest (2019)
99.89
Change on year
up 0.0%
World rank
2nd
of 188 countries
All-time high
99.89
in 2019
All-time low
99.87
in 2014
Years of data
6
2014–2019

Getting electricity (DB16-20 methodology) - Score in South Korea, 2014–2019

0204060801002014201620192014: 99.92015: 99.92016: 99.92017: 99.92018: 99.92019: 99.9

Source: World Bank.

Analysis

The most recent figure for getting electricity (db16-20 methodology) - score in South Korea is 99.89, measured in 2019. That is the highest value across all 6 years on record.

That represents a change of up 0.0% over ten years.

That places South Korea 2nd out of 188 countries with data for 2019, putting it in the top 10%.

Countries ranked near South Korea

  1. 1 United Arab Emirates 100 compare
  2. 3 Hong Kong 99.34 compare
  3. 4 Malaysia 99.27 compare
  4. 5 Germany 98.8 compare

See the full ranking of 190 places →

More private sector data for South Korea

All data for South Korea →

Frequently asked questions

What is getting electricity (db16-20 methodology) - score in South Korea?
Getting electricity (db16-20 methodology) - score in South Korea was 99.89 in 2019, according to the World Bank.
What is the highest getting electricity (db16-20 methodology) - score recorded in South Korea?
The highest recorded value was 99.89 in 2019.
What is the lowest getting electricity (db16-20 methodology) - score recorded in South Korea?
The lowest recorded value was 99.87 in 2014.
How does South Korea rank for getting electricity (db16-20 methodology) - score?
South Korea ranks 2nd out of 188 countries with data for 2019.
Is getting electricity (db16-20 methodology) - score rising or falling in South Korea?
Over the last ten years it is up 0.0%. The long-run trend across the full record is flat.
Where does this South Korea data come from?
The figures come from the World Bank, published as part of Getting electricity (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Getting electricity (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB16-20 studies.