Getting electricity (DB16-20 methodology) - Score in Malaysia
Malaysia: Getting electricity (DB16-20 methodology) - Score was 99.27 in 2019. ▲ Rising
Getting electricity (DB16-20 methodology) - Score in Malaysia, 2014–2019
Source: World Bank.
Analysis
In 2019, getting electricity (db16-20 methodology) - score in Malaysia stood at 99.27. That is the highest value across all 6 years on record.
The figure is up 5.2% over ten years.
Malaysia ranks 4th of 188 countries on this measure, in the top 10%.
Countries ranked near Malaysia
More private sector data for Malaysia
- Merchandise trade 151.7% (2025)
- Food imports 8.3% (2025)
- Manufactures imports 72.0% (2025)
- Merchandise imports 340.44 billion current US$ (2025)
- Food exports 10.4% (2025)
- Manufactures exports 72.7% (2025)
- Merchandise exports 376.04 billion current US$ (2025)
- Commercial service exports 53.33 billion current US$ (2024)
- Transport services 25.7% (2024)
- Computer, communications and other services 45.5% (2024)
Frequently asked questions
- What is getting electricity (db16-20 methodology) - score in Malaysia?
- Getting electricity (db16-20 methodology) - score in Malaysia was 99.27 in 2019, according to the World Bank.
- What is the highest getting electricity (db16-20 methodology) - score recorded in Malaysia?
- The highest recorded value was 99.27 in 2019.
- What is the lowest getting electricity (db16-20 methodology) - score recorded in Malaysia?
- The lowest recorded value was 94.33 in 2015.
- How does Malaysia rank for getting electricity (db16-20 methodology) - score?
- Malaysia ranks 4th out of 188 countries with data for 2019.
- Is getting electricity (db16-20 methodology) - score rising or falling in Malaysia?
- Over the last ten years it is up 5.2%. The long-run trend across the full record is rising.
- Where does this Malaysia data come from?
- The figures come from the World Bank, published as part of Getting electricity (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB16-20 studies.