Getting electricity (DB16-20 methodology) - Score in Singapore
Singapore: Getting electricity (DB16-20 methodology) - Score was 91.77 in 2019. ▬ Flat
Getting electricity (DB16-20 methodology) - Score in Singapore, 2014–2019
Source: World Bank.
Analysis
The most recent figure for getting electricity (db16-20 methodology) - score in Singapore is 91.77, measured in 2019. That is the highest value across all 6 years on record.
Compared with earlier readings it is up 0.5% on the previous year and up 0.6% over ten years.
Singapore ranks 19th of 188 countries on this measure, in the top 10%.
Countries ranked near Singapore
More private sector data for Singapore
- Merchandise trade 177.6% (2025)
- Food imports 3.7% (2024)
- Manufactures imports 70.9% (2024)
- Merchandise imports 505.84 billion current US$ (2025)
- Food exports 2.8% (2024)
- Manufactures exports 74.5% (2024)
- Merchandise exports 566.87 billion current US$ (2025)
- Commercial service exports 421.98 billion current US$ (2025)
- Transport services 31.3% (2025)
- Computer, communications and other services 53.4% (2025)
Frequently asked questions
- What is getting electricity (db16-20 methodology) - score in Singapore?
- Getting electricity (db16-20 methodology) - score in Singapore was 91.77 in 2019, according to the World Bank.
- What is the highest getting electricity (db16-20 methodology) - score recorded in Singapore?
- The highest recorded value was 91.77 in 2019.
- What is the lowest getting electricity (db16-20 methodology) - score recorded in Singapore?
- The lowest recorded value was 91.21 in 2014.
- How does Singapore rank for getting electricity (db16-20 methodology) - score?
- Singapore ranks 19th out of 188 countries with data for 2019.
- Is getting electricity (db16-20 methodology) - score rising or falling in Singapore?
- Over the last ten years it is up 0.6%. The long-run trend across the full record is flat.
- Where does this Singapore data come from?
- The figures come from the World Bank, published as part of Getting electricity (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB16-20 studies.