Getting electricity (DB16-20 methodology) - Score in Singapore

Singapore: Getting electricity (DB16-20 methodology) - Score was 91.77 in 2019. ▬ Flat

Latest (2019)
91.77
Change on year
up 0.5%
World rank
19th
of 188 countries
All-time high
91.77
in 2019
All-time low
91.21
in 2014
Years of data
6
2014–2019

Getting electricity (DB16-20 methodology) - Score in Singapore, 2014–2019

0204060801002014201620192014: 91.22015: 91.22016: 91.32017: 91.32018: 91.32019: 91.8

Source: World Bank.

Analysis

The most recent figure for getting electricity (db16-20 methodology) - score in Singapore is 91.77, measured in 2019. That is the highest value across all 6 years on record.

Compared with earlier readings it is up 0.5% on the previous year and up 0.6% over ten years.

Singapore ranks 19th of 188 countries on this measure, in the top 10%.

Countries ranked near Singapore

  1. 16 Iceland 92.24 compare
  2. 17 France 92.01 compare
  3. 18 Saudi Arabia 91.82 compare
  4. 20 Belarus 90.28 compare
  5. 21 Denmark 90.23 compare
  6. 22 India 89.38 compare

See the full ranking of 190 places →

More private sector data for Singapore

All data for Singapore →

Frequently asked questions

What is getting electricity (db16-20 methodology) - score in Singapore?
Getting electricity (db16-20 methodology) - score in Singapore was 91.77 in 2019, according to the World Bank.
What is the highest getting electricity (db16-20 methodology) - score recorded in Singapore?
The highest recorded value was 91.77 in 2019.
What is the lowest getting electricity (db16-20 methodology) - score recorded in Singapore?
The lowest recorded value was 91.21 in 2014.
How does Singapore rank for getting electricity (db16-20 methodology) - score?
Singapore ranks 19th out of 188 countries with data for 2019.
Is getting electricity (db16-20 methodology) - score rising or falling in Singapore?
Over the last ten years it is up 0.6%. The long-run trend across the full record is flat.
Where does this Singapore data come from?
The figures come from the World Bank, published as part of Getting electricity (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Getting electricity (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB16-20 studies.