Getting electricity: Procedures in Argentina

Argentina: Getting electricity: Procedures was 6 number in 2019. ▬ Flat

Latest (2019)
6 number
Change on year
unchanged
World rank
24th
of 186 countries
All-time high
6 number
in 2009
All-time low
6 number
in 2009
Years of data
11
2009–2019

Getting electricity: Procedures in Argentina, 2009–2019

02462009201420192009: 6 number2010: 6 number2011: 6 number2012: 6 number2013: 6 number2014: 6 number2015: 6 number2016: 6 number2017: 6 number2018: 6 number2019: 6 number

Source: World Bank. Measured in number.

Analysis

Argentina recorded 6 number for getting electricity: procedures in 2019. That is the highest value across all 11 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, getting electricity: procedures in Argentina peaked at 6 number in 2009 and was at its lowest, 6 number, in 2009.

That places Argentina 24th out of 186 countries with data for 2019, putting it in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 6 number 6 number 6 number 1
2010s 6 number 6 number 6 number 10

Countries ranked near Argentina

  1. 23 Mexico 6.83 number compare
  2. 24 Pakistan 6 number compare
  3. 24 Afghanistan 6 number compare
  4. 24 Albania 6 number compare
  5. 24 Belgium 6 number compare
  6. 24 Bulgaria 6 number compare
  7. 24 Cape Verde 6 number compare
  8. 24 Chad 6 number compare
  9. 24 Democratic Republic of Congo 6 number compare
  10. 24 Congo 6 number compare
  11. 24 El Salvador 6 number compare
  12. 24 Eswatini 6 number compare
  13. 24 Iran 6 number compare
  14. 24 Kazakhstan 6 number compare
  15. 24 Kiribati 6 number compare
  16. 24 Madagascar 6 number compare
  17. 24 Malawi 6 number compare
  18. 24 Maldives 6 number compare
  19. 24 Moldova 6 number compare
  20. 24 Myanmar 6 number compare
  21. 24 Namibia 6 number compare
  22. 24 Nicaragua 6 number compare
  23. 24 Peru 6 number compare
  24. 24 Senegal 6 number compare
  25. 24 Saint Lucia 6 number compare
  26. 24 Uganda 6 number compare
  27. 24 Venezuela 6 number compare
  28. 24 Zimbabwe 6 number compare

See the full ranking of 188 places →

More private sector data for Argentina

All data for Argentina →

Frequently asked questions

What is getting electricity: procedures in Argentina?
Getting electricity: procedures in Argentina was 6 number in 2019, according to the World Bank.
What is the highest getting electricity: procedures recorded in Argentina?
The highest recorded value was 6 number in 2009.
What is the lowest getting electricity: procedures recorded in Argentina?
The lowest recorded value was 6 number in 2009.
How does Argentina rank for getting electricity: procedures?
Argentina ranks 24th out of 186 countries with data for 2019.
Is getting electricity: procedures rising or falling in Argentina?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Argentina data come from?
The figures come from the World Bank, published as part of Getting electricity: Procedures (number). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,045 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.