Getting electricity: Procedures in Uganda
Uganda: Getting electricity: Procedures was 6 number in 2019. ▲ Rising
Getting electricity: Procedures in Uganda, 2009–2019
Source: World Bank. Measured in number.
Analysis
In 2019, getting electricity: procedures in Uganda stood at 6 number. That is the highest value across all 11 years on record.
The figure is up 20.0% over ten years.
Over the whole period, getting electricity: procedures in Uganda peaked at 6 number in 2011 and was at its lowest, 5 number, in 2009.
Uganda ranks 24th of 186 countries on this measure, in the top quarter.
The long-run direction has been consistently rising across the 11 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 5 number | 5 number | 5 number | 1 |
| 2010s | 5.9 number | 5 number | 6 number | 10 |
Countries ranked near Uganda
- 23 Mexico 6.83 number compare
- 24 Pakistan 6 number compare
- 24 Afghanistan 6 number compare
- 24 Albania 6 number compare
- 24 Argentina 6 number compare
- 24 Belgium 6 number compare
- 24 Bulgaria 6 number compare
- 24 Cape Verde 6 number compare
- 24 Chad 6 number compare
- 24 Democratic Republic of Congo 6 number compare
- 24 Congo 6 number compare
- 24 El Salvador 6 number compare
- 24 Eswatini 6 number compare
- 24 Iran 6 number compare
- 24 Kazakhstan 6 number compare
- 24 Kiribati 6 number compare
- 24 Madagascar 6 number compare
- 24 Malawi 6 number compare
- 24 Maldives 6 number compare
- 24 Moldova 6 number compare
- 24 Myanmar 6 number compare
- 24 Namibia 6 number compare
- 24 Nicaragua 6 number compare
- 24 Peru 6 number compare
- 24 Senegal 6 number compare
- 24 Saint Lucia 6 number compare
- 24 Venezuela 6 number compare
- 24 Zimbabwe 6 number compare
More private sector data for Uganda
- Merchandise trade 49.9% (2025)
- Food imports 10.7% (2024)
- Manufactures imports 47.3% (2024)
- Merchandise imports 18.40 billion current US$ (2025)
- Food exports 39.3% (2024)
- Manufactures exports 14.3% (2024)
- Merchandise exports 12.50 billion current US$ (2025)
- Commercial service exports 2.24 billion current US$ (2024)
- Transport services 58.0% (2024)
- Computer, communications and other services 30.0% (2024)
Frequently asked questions
- What is getting electricity: procedures in Uganda?
- Getting electricity: procedures in Uganda was 6 number in 2019, according to the World Bank.
- What is the highest getting electricity: procedures recorded in Uganda?
- The highest recorded value was 6 number in 2011.
- What is the lowest getting electricity: procedures recorded in Uganda?
- The lowest recorded value was 5 number in 2009.
- How does Uganda rank for getting electricity: procedures?
- Uganda ranks 24th out of 186 countries with data for 2019.
- Is getting electricity: procedures rising or falling in Uganda?
- Over the last ten years it is up 20.0%. The long-run trend across the full record is rising.
- Where does this Uganda data come from?
- The figures come from the World Bank, published as part of Getting electricity: Procedures (number). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.