Getting electricity: Procedures (number) in Mauritius
Mauritius: Getting electricity: Procedures was 3 number in 2019. ▬ Flat
Getting electricity: Procedures in Mauritius, 2009–2019
Source: World Bank. Measured in number.
Analysis
The most recent figure for getting electricity: procedures in Mauritius is 3 number, measured in 2019. That is the highest value across all 11 years on record.
The figure is unchanged over ten years.
Over the whole period, getting electricity: procedures in Mauritius peaked at 3 number in 2009 and was at its lowest, 3 number, in 2009.
Mauritius ranks 162nd of 189 countries on this measure, in the bottom quarter.
Getting electricity: Procedures in Mauritius, year by year
| Year | number | Change |
|---|---|---|
| 2009 | 3 number | — |
| 2010 | 3 number | +0.0% |
| 2011 | 3 number | +0.0% |
| 2012 | 3 number | +0.0% |
| 2013 | 3 number | +0.0% |
| 2014 | 3 number | +0.0% |
| 2015 | 3 number | +0.0% |
| 2016 | 3 number | +0.0% |
| 2017 | 3 number | +0.0% |
| 2018 | 3 number | +0.0% |
| 2019 | 3 number | +0.0% |
Mauritius compared with similar countries
- Mauritius's 3 number is below the median for upper middle income countries, which is 5 number, 60% of the median. (56 countries reporting)
- Mauritius's 3 number is below the median for Sub-Saharan Africa, which is 5 number, 60% of the median. (46 countries reporting)
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 3 number | 3 number | 3 number | 1 |
| 2010s | 3 number | 3 number | 3 number | 10 |
Countries ranked near Mauritius
- 161 India 3.47 number compare
- 162 Belarus 3 number compare
- 162 Comoros 3 number compare
- 162 Czechia 3 number compare
- 162 Georgia 3 number compare
- 162 Germany 3 number compare
- 162 Hong Kong 3 number compare
- 162 Kenya 3 number compare
- 162 South Korea 3 number compare
- 162 Lithuania 3 number compare
- 162 Malaysia 3 number compare
- 162 Micronesia (country) 3 number compare
- 162 North Macedonia 3 number compare
- 162 San Marino 3 number compare
- 162 Saint Vincent and the Grenadines 3 number compare
- 162 Sweden 3 number compare
- 162 Switzerland 3 number compare
- 162 Taiwan 3 number compare
- 162 East Timor 3 number compare
- 162 Togo 3 number compare
- 162 United Kingdom 3 number compare
More private sector data for Mauritius
- Merchandise trade 57.4% (2025)
- Food imports 21.2% (2024)
- Manufactures imports 54.2% (2024)
- Merchandise imports 6.94 billion current US$ (2025)
- Food exports 50.9% (2024)
- Manufactures exports 46.1% (2024)
- Merchandise exports 2.34 billion current US$ (2025)
- Merchandise exports (current US$), per capita 1,883 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.1449 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate -1.1 % change on previous year (2025)
Frequently asked questions
- What is getting electricity: procedures in Mauritius?
- Getting electricity: procedures in Mauritius was 3 number in 2019, according to the World Bank.
- What is the highest getting electricity: procedures recorded in Mauritius?
- The highest recorded value was 3 number in 2009.
- What is the lowest getting electricity: procedures recorded in Mauritius?
- The lowest recorded value was 3 number in 2009.
- How does Mauritius rank for getting electricity: procedures?
- Mauritius ranks 162nd out of 189 countries with data for 2019.
- Is getting electricity: procedures rising or falling in Mauritius?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Mauritius data come from?
- The figures come from the World Bank, published as part of Getting electricity: Procedures (number). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.