Getting electricity: System average interruption duration in Grenada

Grenada: Getting electricity: System average interruption duration index was 6.36 DB16-20 methodology in 2019. ▲ Rising

Latest (2019)
6.36 DB16-20 methodology
Change on year
down 12.9%
World rank
36th
of 127 countries
All-time high
7.3 DB16-20 methodology
in 2018
All-time low
2.11 DB16-20 methodology
in 2016
Years of data
6
2014–2019

Getting electricity: System average interruption duration index in Grenada, 2014–2019

24682014201620192014: 3.2 DB16-20 methodology2015: 3.4 DB16-20 methodology2016: 2.1 DB16-20 methodology2017: 5.1 DB16-20 methodology2018: 7.3 DB16-20 methodology2019: 6.4 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for getting electricity: system average interruption duration index in Grenada is 6.36 DB16-20 methodology, measured in 2019.

The figure is down 12.9% on the previous year and up 101.3% over ten years.

That places Grenada 36th out of 127 countries with data for 2019, putting it in the middle of the range.

Getting electricity: System average interruption duration index in Grenada, year by year

Annual values for Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology) in Grenada, 2014 to 2019.
Year DB16-20 methodology Change
2014 3.16 DB16-20 methodology —
2015 3.41 DB16-20 methodology +7.9%
2016 2.11 DB16-20 methodology -38.1%
2017 5.1 DB16-20 methodology +141.7%
2018 7.3 DB16-20 methodology +43.1%
2019 6.36 DB16-20 methodology -12.9%

Grenada compared with similar countries

  • Grenada's 6.36 DB16-20 methodology is above the median for upper middle income countries, which is 4.37 DB16-20 methodology, 1.5× the median. (44 countries reporting)
  • Grenada's 6.36 DB16-20 methodology is above the median for Latin America & Caribbean, which is 6.35 DB16-20 methodology, 1.0× the median. (26 countries reporting)

Countries ranked near Grenada

  1. 33 Dominican Republic 6.64 DB16-20 methodology compare
  2. 34 Brazil 6.64 DB16-20 methodology compare
  3. 35 Peru 6.39 DB16-20 methodology compare
  4. 37 Trinidad and Tobago 6.34 DB16-20 methodology compare
  5. 38 Bulgaria 6.15 DB16-20 methodology compare
  6. 39 El Salvador 5.83 DB16-20 methodology compare

See the full ranking of 127 places →

More private sector data for Grenada

All data for Grenada →

Frequently asked questions

What is getting electricity: system average interruption duration index in Grenada?
Getting electricity: system average interruption duration index in Grenada was 6.36 DB16-20 methodology in 2019, according to the World Bank.
What is the highest getting electricity: system average interruption duration index recorded in Grenada?
The highest recorded value was 7.3 DB16-20 methodology in 2018.
What is the lowest getting electricity: system average interruption duration index recorded in Grenada?
The lowest recorded value was 2.11 DB16-20 methodology in 2016.
How does Grenada rank for getting electricity: system average interruption duration index?
Grenada ranks 36th out of 127 countries with data for 2019.
Is getting electricity: system average interruption duration index rising or falling in Grenada?
Over the last ten years it is up 101.3%. The long-run trend across the full record is rising.
Where does this Grenada data come from?
The figures come from the World Bank, published as part of Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Getting electricity: System average interruption duration index in Grenada. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/getting-electricity-system-average-interruption-duration-index-saidi-db16-20-methodology/grenada/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/getting-electricity-system-average-interruption-duration-index-saidi-db16-20-methodology/grenada/">Getting electricity: System average interruption duration index in Grenada</a> — Statizoid

About this data

Indicator
Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
127 places, 758 data points, 2014–2019
Last refreshed

The system average interruption duration index is the average total duration of outages (in hours) experienced by a customer in a year. The index is computed based on the methodology in the DB16-20 studies.