Getting electricity: System average interruption duration in Niger

Niger: Getting electricity: System average interruption duration index was 165 DB16-20 methodology in 2019. ▼ Falling

Latest (2019)
165 DB16-20 methodology
Change on year
down 54.8%
World rank
3rd
of 127 countries
All-time high
365 DB16-20 methodology
in 2017
All-time low
165 DB16-20 methodology
in 2019
Years of data
5
2014–2019

Getting electricity: System average interruption duration index in Niger, 2014–2019

01002003004002014201620192014: 199 DB16-20 methodology2015: 290 DB16-20 methodology2016: 229 DB16-20 methodology2017: 365 DB16-20 methodology2019: 165 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for getting electricity: system average interruption duration index in Niger is 165 DB16-20 methodology, measured in 2019. That is the lowest value across all 5 years on record.

That represents a change of down 54.8% on the previous year and down 17.1% over ten years.

Niger ranks 3rd of 127 countries on this measure, in the top 10%.

Getting electricity: System average interruption duration index in Niger, year by year

Annual values for Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology) in Niger, 2014 to 2019.
Year DB16-20 methodology Change
2014 199 DB16-20 methodology —
2015 290 DB16-20 methodology +45.7%
2016 229 DB16-20 methodology -21.0%
2017 365 DB16-20 methodology +59.4%
2019 165 DB16-20 methodology -54.8%

Niger compared with similar countries

  • Niger's 165 DB16-20 methodology is above the median for Sub-Saharan Africa, which is 18.3 DB16-20 methodology, 9.0× the median. (11 countries reporting)

Countries ranked near Niger

  1. 1 Papua New Guinea 940 DB16-20 methodology compare
  2. 2 Palau 615.7 DB16-20 methodology compare
  3. 4 Guyana 113 DB16-20 methodology compare
  4. 5 Nicaragua 93.6 DB16-20 methodology compare
  5. 6 Mongolia 62 DB16-20 methodology compare

See the full ranking of 127 places →

More private sector data for Niger

All data for Niger →

Frequently asked questions

What is getting electricity: system average interruption duration index in Niger?
Getting electricity: system average interruption duration index in Niger was 165 DB16-20 methodology in 2019, according to the World Bank.
What is the highest getting electricity: system average interruption duration index recorded in Niger?
The highest recorded value was 365 DB16-20 methodology in 2017.
What is the lowest getting electricity: system average interruption duration index recorded in Niger?
The lowest recorded value was 165 DB16-20 methodology in 2019.
How does Niger rank for getting electricity: system average interruption duration index?
Niger ranks 3rd out of 127 countries with data for 2019.
Is getting electricity: system average interruption duration index rising or falling in Niger?
Over the last ten years it is down 17.1%. The long-run trend across the full record is falling.
Where does this Niger data come from?
The figures come from the World Bank, published as part of Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 5 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Getting electricity: System average interruption duration index in Niger. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/getting-electricity-system-average-interruption-duration-index-saidi-db16-20-methodology/niger/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/getting-electricity-system-average-interruption-duration-index-saidi-db16-20-methodology/niger/">Getting electricity: System average interruption duration index in Niger</a> — Statizoid

About this data

Indicator
Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
127 places, 758 data points, 2014–2019
Last refreshed

The system average interruption duration index is the average total duration of outages (in hours) experienced by a customer in a year. The index is computed based on the methodology in the DB16-20 studies.