Getting electricity: System average interruption duration index (SAIDI in Niger

Niger: Getting electricity: System average interruption duration index (SAIDI was 165 DB16-20 methodology in 2019. ▼ Falling

Latest (2019)
165 DB16-20 methodology
Change on year
down 54.8%
World rank
3rd
of 125 countries
All-time high
365 DB16-20 methodology
in 2017
All-time low
165 DB16-20 methodology
in 2019
Years of data
5
2014–2019

Getting electricity: System average interruption duration index (SAIDI in Niger, 2014–2019

01002003004002014201620192014: 199 DB16-20 methodology2015: 290 DB16-20 methodology2016: 229 DB16-20 methodology2017: 365 DB16-20 methodology2019: 165 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for getting electricity: system average interruption duration index (saidi in Niger is 165 DB16-20 methodology, measured in 2019. That is the lowest value across all 5 years on record.

That represents a change of down 54.8% on the previous year and down 17.1% over ten years.

Niger ranks 3rd of 125 countries on this measure, in the top 10%.

Countries ranked near Niger

  1. 1 Kosovo 10.42 DB16-20 methodology compare
  2. 1 Papua New Guinea 940 DB16-20 methodology compare
  3. 2 Palau 615.7 DB16-20 methodology compare
  4. 4 Guyana 113 DB16-20 methodology compare
  5. 5 Nicaragua 93.6 DB16-20 methodology compare
  6. 6 Mongolia 62 DB16-20 methodology compare

See the full ranking of 126 places →

More private sector data for Niger

All data for Niger →

Frequently asked questions

What is getting electricity: system average interruption duration index (saidi in Niger?
Getting electricity: system average interruption duration index (saidi in Niger was 165 DB16-20 methodology in 2019, according to the World Bank.
What is the highest getting electricity: system average interruption duration index (saidi recorded in Niger?
The highest recorded value was 365 DB16-20 methodology in 2017.
What is the lowest getting electricity: system average interruption duration index (saidi recorded in Niger?
The lowest recorded value was 165 DB16-20 methodology in 2019.
How does Niger rank for getting electricity: system average interruption duration index (saidi?
Niger ranks 3rd out of 125 countries with data for 2019.
Is getting electricity: system average interruption duration index (saidi rising or falling in Niger?
Over the last ten years it is down 17.1%. The long-run trend across the full record is falling.
Where does this Niger data come from?
The figures come from the World Bank, published as part of Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 5 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
126 places, 752 data points, 2014–2019
Last refreshed

The system average interruption duration index is the average total duration of outages (in hours) experienced by a customer in a year. The index is computed based on the methodology in the DB16-20 studies.