Getting electricity: System average interruption duration in Saint Lucia

Saint Lucia: Getting electricity: System average interruption duration index was 0.18 DB16-20 methodology in 2019. ▼ Falling

Latest (2019)
0.18 DB16-20 methodology
Change on year
up 5.9%
World rank
121st
of 127 countries
All-time high
0.53 DB16-20 methodology
in 2016
All-time low
0.17 DB16-20 methodology
in 2018
Years of data
6
2014–2019

Getting electricity: System average interruption duration index in Saint Lucia, 2014–2019

0.20.30.40.52014201620192014: 0.45 DB16-20 methodology2015: 0.34 DB16-20 methodology2016: 0.53 DB16-20 methodology2017: 0.38 DB16-20 methodology2018: 0.17 DB16-20 methodology2019: 0.18 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

Saint Lucia recorded 0.18 DB16-20 methodology for getting electricity: system average interruption duration index in 2019.

Compared with earlier readings it is up 5.9% on the previous year and down 60.0% over ten years.

That places Saint Lucia 121st out of 127 countries with data for 2019, putting it in the bottom quarter.

Getting electricity: System average interruption duration index in Saint Lucia, year by year

Annual values for Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology) in Saint Lucia, 2014 to 2019.
Year DB16-20 methodology Change
2014 0.45 DB16-20 methodology —
2015 0.34 DB16-20 methodology -24.4%
2016 0.53 DB16-20 methodology +55.9%
2017 0.38 DB16-20 methodology -28.3%
2018 0.17 DB16-20 methodology -55.3%
2019 0.18 DB16-20 methodology +5.9%

Saint Lucia compared with similar countries

  • Saint Lucia's 0.18 DB16-20 methodology is below the median for upper middle income countries, which is 4.37 DB16-20 methodology, 4% of the median. (44 countries reporting)
  • Saint Lucia's 0.18 DB16-20 methodology is below the median for Latin America & Caribbean, which is 6.35 DB16-20 methodology, 3% of the median. (26 countries reporting)

Countries ranked near Saint Lucia

  1. 118 Finland 0.2 DB16-20 methodology compare
  2. 118 Switzerland 0.2 DB16-20 methodology compare
  3. 120 Russia 0.182 DB16-20 methodology compare
  4. 122 Slovenia 0.13 DB16-20 methodology compare
  5. 123 Kuwait 0.1 DB16-20 methodology compare
  6. 124 Qatar 0.07 DB16-20 methodology compare

See the full ranking of 127 places →

More private sector data for Saint Lucia

All data for Saint Lucia →

Frequently asked questions

What is getting electricity: system average interruption duration index in Saint Lucia?
Getting electricity: system average interruption duration index in Saint Lucia was 0.18 DB16-20 methodology in 2019, according to the World Bank.
What is the highest getting electricity: system average interruption duration index recorded in Saint Lucia?
The highest recorded value was 0.53 DB16-20 methodology in 2016.
What is the lowest getting electricity: system average interruption duration index recorded in Saint Lucia?
The lowest recorded value was 0.17 DB16-20 methodology in 2018.
How does Saint Lucia rank for getting electricity: system average interruption duration index?
Saint Lucia ranks 121st out of 127 countries with data for 2019.
Is getting electricity: system average interruption duration index rising or falling in Saint Lucia?
Over the last ten years it is down 60.0%. The long-run trend across the full record is falling.
Where does this Saint Lucia data come from?
The figures come from the World Bank, published as part of Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Getting electricity: System average interruption duration index in Saint Lucia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/getting-electricity-system-average-interruption-duration-index-saidi-db16-20-methodology/st-lucia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/getting-electricity-system-average-interruption-duration-index-saidi-db16-20-methodology/st-lucia/">Getting electricity: System average interruption duration index in Saint Lucia</a> — Statizoid

About this data

Indicator
Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
127 places, 758 data points, 2014–2019
Last refreshed

The system average interruption duration index is the average total duration of outages (in hours) experienced by a customer in a year. The index is computed based on the methodology in the DB16-20 studies.