Getting electricity: System average interruption duration in Switzerland

Switzerland: Getting electricity: System average interruption duration index was 0.2 DB16-20 methodology in 2019. ▲ Rising

Latest (2019)
0.2 DB16-20 methodology
Change on year
down 4.8%
World rank
118th
of 127 countries
All-time high
0.23 DB16-20 methodology
in 2017
All-time low
0.14 DB16-20 methodology
in 2015
Years of data
6
2014–2019

Getting electricity: System average interruption duration index in Switzerland, 2014–2019

00.050.10.150.20.252014201620192014: 0.19 DB16-20 methodology2015: 0.14 DB16-20 methodology2016: 0.2 DB16-20 methodology2017: 0.23 DB16-20 methodology2018: 0.21 DB16-20 methodology2019: 0.2 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for getting electricity: system average interruption duration index in Switzerland is 0.2 DB16-20 methodology, measured in 2019.

The figure is down 4.8% on the previous year and up 5.3% over ten years.

That places Switzerland 118th out of 127 countries with data for 2019, putting it in the bottom quarter.

Getting electricity: System average interruption duration index in Switzerland, year by year

Annual values for Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology) in Switzerland, 2014 to 2019.
Year DB16-20 methodology Change
2014 0.19 DB16-20 methodology —
2015 0.14 DB16-20 methodology -26.3%
2016 0.2 DB16-20 methodology +42.9%
2017 0.23 DB16-20 methodology +15.0%
2018 0.21 DB16-20 methodology -8.7%
2019 0.2 DB16-20 methodology -4.8%

Switzerland compared with similar countries

  • Switzerland's 0.2 DB16-20 methodology is below the median for high income countries, which is 0.775 DB16-20 methodology, 26% of the median. (60 countries reporting)
  • Switzerland's 0.2 DB16-20 methodology is below the median for Europe & Central Asia, which is 0.79 DB16-20 methodology, 25% of the median. (46 countries reporting)

Countries ranked near Switzerland

  1. 115 Germany 0.25 DB16-20 methodology compare
  2. 115 United Arab Emirates 0.25 DB16-20 methodology compare
  3. 117 Uzbekistan 0.22 DB16-20 methodology compare
  4. 118 Finland 0.2 DB16-20 methodology compare
  5. 120 Russia 0.182 DB16-20 methodology compare
  6. 121 Saint Lucia 0.18 DB16-20 methodology compare

See the full ranking of 127 places →

More private sector data for Switzerland

All data for Switzerland →

Frequently asked questions

What is getting electricity: system average interruption duration index in Switzerland?
Getting electricity: system average interruption duration index in Switzerland was 0.2 DB16-20 methodology in 2019, according to the World Bank.
What is the highest getting electricity: system average interruption duration index recorded in Switzerland?
The highest recorded value was 0.23 DB16-20 methodology in 2017.
What is the lowest getting electricity: system average interruption duration index recorded in Switzerland?
The lowest recorded value was 0.14 DB16-20 methodology in 2015.
How does Switzerland rank for getting electricity: system average interruption duration index?
Switzerland ranks 118th out of 127 countries with data for 2019.
Is getting electricity: system average interruption duration index rising or falling in Switzerland?
Over the last ten years it is up 5.3%. The long-run trend across the full record is rising.
Where does this Switzerland data come from?
The figures come from the World Bank, published as part of Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Getting electricity: System average interruption duration index in Switzerland. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/getting-electricity-system-average-interruption-duration-index-saidi-db16-20-methodology/switzerland/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/getting-electricity-system-average-interruption-duration-index-saidi-db16-20-methodology/switzerland/">Getting electricity: System average interruption duration index in Switzerland</a> — Statizoid

About this data

Indicator
Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
127 places, 758 data points, 2014–2019
Last refreshed

The system average interruption duration index is the average total duration of outages (in hours) experienced by a customer in a year. The index is computed based on the methodology in the DB16-20 studies.