Benin vs Cote d'Ivoire: Dealing with construction permits, cost (% of income per capita)

Benin
167.4%
in 2012
Cote d'Ivoire
155.1%
in 2012
Benin rank
35th
Cote d'Ivoire rank
36th

Dealing with construction permits, cost (% of income per capita) over time

  • Benin
  • Cote d'Ivoire
050100150200200520082012

How they compare

Benin currently reports 167.4% against 155.1% in Cote d'Ivoire, a difference of 12.3%.

That makes Benin's figure about 1.1 times Cote d'Ivoire's.

The two have swapped places 3 times across 8 shared years of data; in 2005 it was Cote d'Ivoire ahead.

Benin ranks 35th and Cote d'Ivoire ranks 36th of 50 countries.

Cote d'Ivoire has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Benin Cote d'Ivoire Difference Ahead
2000s 182.1% 188.0% 5.9% Cote d'Ivoire
2010s 161.6% 164.7% 3.0% Cote d'Ivoire

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits, cost, Benin or Cote d'Ivoire?
Benin, at 167.4% against 155.1% in Cote d'Ivoire as of 2012.
What is the difference in dealing with construction permits, cost between Benin and Cote d'Ivoire?
12.3%, with Benin ahead.
How many years of comparable data are there for Benin and Cote d'Ivoire?
8 years are reported by both, from 2005 to 2012.
How do Benin and Cote d'Ivoire rank globally for dealing with construction permits, cost?
Benin ranks 35th and Cote d'Ivoire ranks 36th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Benin vs Cote d'Ivoire: Dealing with construction permits, cost. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 08 November 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/benin/cote-d-ivoire/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/benin/cote-d-ivoire/">Benin vs Cote d'Ivoire: Dealing with construction permits, cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.