Dealing with construction permits, cost in Côte d'Ivoire
Côte d'Ivoire: Dealing with construction permits, cost was 155.1% in 2012. ▼ Falling
Dealing with construction permits, cost in Côte d'Ivoire, 2005–2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.
Analysis
In 2012, dealing with construction permits, cost in Côte d'Ivoire stood at 155.1%. That is the lowest value across all 8 years on record.
The figure is down 7.9% on the previous year and down 19.9% over ten years.
Côte d'Ivoire ranks 36th of 50 countries on this measure, in the middle of the range.
Dealing with construction permits, cost in Côte d'Ivoire, year by year
| Year | % of income per capita | Change |
|---|---|---|
| 2005 | 193.7% | — |
| 2006 | 195.0% | +0.7% |
| 2007 | 189.1% | -3.0% |
| 2008 | 185.7% | -1.8% |
| 2009 | 176.3% | -5.1% |
| 2010 | 170.5% | -3.3% |
| 2011 | 168.4% | -1.2% |
| 2012 | 155.1% | -7.9% |
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 188.0% | 176.3% | 195.0% | 5 |
| 2010s | 164.7% | 155.1% | 170.5% | 3 |
Countries ranked near Côte d'Ivoire
More private sector data for Côte d'Ivoire
- Merchandise trade 47.9% (2025)
- Food imports 20.5% (2024)
- Manufactures imports 51.2% (2024)
- Merchandise imports 19.27 billion current US$ (2025)
- Food exports 47.2% (2024)
- Manufactures exports 8.0% (2024)
- Merchandise exports 28.47 billion current US$ (2025)
- Merchandise exports (current US$), per capita 870.37 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.2854 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 38.55 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits, cost in Côte d'Ivoire?
- Dealing with construction permits, cost in Côte d'Ivoire was 155.1% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest dealing with construction permits, cost recorded in Côte d'Ivoire?
- The highest recorded value was 195.0% in 2006.
- What is the lowest dealing with construction permits, cost recorded in Côte d'Ivoire?
- The lowest recorded value was 155.1% in 2012.
- How does Côte d'Ivoire rank for dealing with construction permits, cost?
- Côte d'Ivoire ranks 36th out of 50 countries with data for 2012.
- Is dealing with construction permits, cost rising or falling in Côte d'Ivoire?
- Over the last ten years it is down 19.9%. The long-run trend across the full record is falling.
- Where does this Côte d'Ivoire data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.