Cape Verde vs Togo: Dealing with construction permits, cost

Cape Verde
459.4%
in 2012
Togo
431.5%
in 2012
Cape Verde rank
20th
Togo rank
21st

Dealing with construction permits, cost over time

  • Cape Verde
  • Togo
0200400600800200520082012

How they compare

Cape Verde currently reports 459.4% against 431.5% in Togo, a difference of 27.9%.

That makes Cape Verde's figure about 1.1 times Togo's.

The two have swapped places 2 times across 8 shared years of data; in 2005 it was Cape Verde ahead.

Cape Verde ranks 20th and Togo ranks 21st of 50 countries.

Across the 2 decades both report, Cape Verde averaged higher in 1 and Togo in 1.

Head to head by decade

Decade Cape Verde Togo Difference Ahead
2000s 696.9% 602.9% 94.0% Cape Verde
2010s 517.7% 525.1% 7.4% Togo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits, cost, Cape Verde or Togo?
Cape Verde, at 459.4% against 431.5% in Togo as of 2012.
What is the difference in dealing with construction permits, cost between Cape Verde and Togo?
27.9%, with Cape Verde ahead.
How many years of comparable data are there for Cape Verde and Togo?
8 years are reported by both, from 2005 to 2012.
How do Cape Verde and Togo rank globally for dealing with construction permits, cost?
Cape Verde ranks 20th and Togo ranks 21st of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Cape Verde vs Togo: Dealing with construction permits, cost. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 07 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/cabo-verde/togo/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/cabo-verde/togo/">Cape Verde vs Togo: Dealing with construction permits, cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.