Dealing with construction permits, cost in Cape Verde

Cape Verde: Dealing with construction permits, cost was 459.4% in 2012. ▼ Falling

Latest (2012)
459.4%
Change on year
down 12.3%
World rank
20th
of 50 countries
All-time high
815.9%
in 2006
All-time low
459.4%
in 2012
Years of data
8
2005–2012

Dealing with construction permits, cost in Cape Verde, 2005–2012

02004006008002005200820122005: 788.4 % of income per capita2006: 815.9 % of income per capita2007: 718.3 % of income per capita2008: 639.1 % of income per capita2009: 522.6 % of income per capita2010: 570 % of income per capita2011: 523.8 % of income per capita2012: 459.4 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

The most recent figure for dealing with construction permits, cost in Cape Verde is 459.4%, measured in 2012. That is the lowest value across all 8 years on record.

Compared with earlier readings it is down 12.3% on the previous year and down 41.7% over ten years.

That places Cape Verde 20th out of 50 countries with data for 2012, putting it in the middle of the range.

Dealing with construction permits, cost in Cape Verde, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Cape Verde, 2005 to 2012.
Year % of income per capita Change
2005 788.4%
2006 815.9% +3.5%
2007 718.3% -12.0%
2008 639.1% -11.0%
2009 522.6% -18.2%
2010 570.0% +9.1%
2011 523.8% -8.1%
2012 459.4% -12.3%

Averages by decade

DecadeAverage LowestHighest Years
2000s 696.9% 522.6% 815.9% 5
2010s 517.7% 459.4% 570.0% 3

Countries ranked near Cape Verde

  1. 17 Liberia 559.7% compare
  2. 18 Senegal 529.1% compare
  3. 19 Ghana 481.2% compare
  4. 21 Togo 431.5% compare
  5. 22 Mali 418.6% compare
  6. 23 Nigeria 417.7% compare

See the full ranking of 56 places →

More private sector data for Cape Verde

All data for Cape Verde →

Frequently asked questions

What is dealing with construction permits, cost in Cape Verde?
Dealing with construction permits, cost in Cape Verde was 459.4% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Cape Verde?
The highest recorded value was 815.9% in 2006.
What is the lowest dealing with construction permits, cost recorded in Cape Verde?
The lowest recorded value was 459.4% in 2012.
How does Cape Verde rank for dealing with construction permits, cost?
Cape Verde ranks 20th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Cape Verde?
Over the last ten years it is down 41.7%. The long-run trend across the full record is falling.
Where does this Cape Verde data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Cape Verde. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 01 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/cabo-verde/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/cabo-verde/">Dealing with construction permits, cost in Cape Verde</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.