Cameroon vs Lesotho: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Cameroon
- Lesotho
How they compare
Cameroon currently reports 1,008.7% against 950.4% in Lesotho, a difference of 58.3%.
That makes Cameroon's figure about 1.1 times Lesotho's.
The two have swapped places 2 times across 8 shared years of data; in 2005 it was Cameroon ahead.
Cameroon ranks 12th and Lesotho ranks 13th of 50 countries.
Cameroon has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Cameroon | Lesotho | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 1,140.8% | 719.4% | 421.3% | Cameroon |
| 2010s | 1,084.8% | 1,027.8% | 57.0% | Cameroon |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Cameroon or Lesotho?
- Cameroon, at 1,008.7% against 950.4% in Lesotho as of 2012.
- What is the difference in dealing with construction permits, cost between Cameroon and Lesotho?
- 58.3%, with Cameroon ahead.
- How many years of comparable data are there for Cameroon and Lesotho?
- 8 years are reported by both, from 2005 to 2012.
- How do Cameroon and Lesotho rank globally for dealing with construction permits, cost?
- Cameroon ranks 12th and Lesotho ranks 13th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.