Dealing with construction permits, cost in Cameroon

Cameroon: Dealing with construction permits, cost was 1,008.7% in 2012. ▼ Falling

Latest (2012)
1,008.7%
Change on year
down 8.0%
World rank
12th
of 50 countries
All-time high
1,297.4%
in 2005
All-time low
1,008.7%
in 2012
Years of data
8
2005–2012

Dealing with construction permits, cost in Cameroon, 2005–2012

05001.0k1.5k2005200820122005: 1.3k % of income per capita2006: 1.1k % of income per capita2007: 1.1k % of income per capita2008: 1.1k % of income per capita2009: 1.1k % of income per capita2010: 1.1k % of income per capita2011: 1.1k % of income per capita2012: 1.0k % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

In 2012, dealing with construction permits, cost in Cameroon stood at 1,008.7%. That is the lowest value across all 8 years on record.

Compared with earlier readings it is down 8.0% on the previous year and down 22.3% over ten years.

Cameroon ranks 12th of 50 countries on this measure, in the top quarter.

Dealing with construction permits, cost in Cameroon, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Cameroon, 2005 to 2012.
Year % of income per capita Change
2005 1,297.4%
2006 1,122.4% -13.5%
2007 1,061.2% -5.5%
2008 1,126.8% +6.2%
2009 1,096.1% -2.7%
2010 1,149.5% +4.9%
2011 1,096.2% -4.6%
2012 1,008.7% -8.0%

Averages by decade

DecadeAverage LowestHighest Years
2000s 1,140.8% 1,061.2% 1,297.4% 5
2010s 1,084.8% 1,008.7% 1,149.5% 3

Countries ranked near Cameroon

  1. 9 Malawi 1,198.3% compare
  2. 10 Congo 1,151.4% compare
  3. 11 Madagascar 1,116.9% compare
  4. 13 Lesotho 950.4% compare
  5. 14 Uganda 853.1% compare
  6. 15 Guinea-Bissau 785.2% compare

See the full ranking of 56 places →

More private sector data for Cameroon

All data for Cameroon →

Frequently asked questions

What is dealing with construction permits, cost in Cameroon?
Dealing with construction permits, cost in Cameroon was 1,008.7% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Cameroon?
The highest recorded value was 1,297.4% in 2005.
What is the lowest dealing with construction permits, cost recorded in Cameroon?
The lowest recorded value was 1,008.7% in 2012.
How does Cameroon rank for dealing with construction permits, cost?
Cameroon ranks 12th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Cameroon?
Over the last ten years it is down 22.3%. The long-run trend across the full record is falling.
Where does this Cameroon data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Cameroon. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 31 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/cameroon/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/cameroon/">Dealing with construction permits, cost in Cameroon</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.