Côte d'Ivoire vs Gambia: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Côte d'Ivoire
- Gambia
How they compare
Côte d'Ivoire currently reports 155.1% against 124.7% in Gambia, a difference of 30.4%.
That makes Côte d'Ivoire's figure about 1.2 times Gambia's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Gambia ahead.
Côte d'Ivoire ranks 36th and Gambia ranks 39th of 50 countries.
Gambia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Côte d'Ivoire | Gambia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 188.0% | 241.7% | 53.8% | Gambia |
| 2010s | 164.7% | 175.0% | 10.3% | Gambia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Côte d'Ivoire or Gambia?
- Côte d'Ivoire, at 155.1% against 124.7% in Gambia as of 2012.
- What is the difference in dealing with construction permits, cost between Côte d'Ivoire and Gambia?
- 30.4%, with Côte d'Ivoire ahead.
- How many years of comparable data are there for Côte d'Ivoire and Gambia?
- 8 years are reported by both, from 2005 to 2012.
- How do Côte d'Ivoire and Gambia rank globally for dealing with construction permits, cost?
- Côte d'Ivoire ranks 36th and Gambia ranks 39th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.