Dealing with construction permits, cost in Gambia

Gambia: Dealing with construction permits, cost was 124.7% in 2012. ▼ Falling

Latest (2012)
124.7%
Change on year
down 35.4%
World rank
39th
of 50 countries
All-time high
259.9%
in 2005
All-time low
124.7%
in 2012
Years of data
8
2005–2012

Dealing with construction permits, cost in Gambia, 2005–2012

01002003002005200820122005: 259.9 % of income per capita2006: 238.7 % of income per capita2007: 229.2 % of income per capita2008: 259.4 % of income per capita2009: 221.5 % of income per capita2010: 207.3 % of income per capita2011: 193 % of income per capita2012: 124.7 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

In 2012, dealing with construction permits, cost in Gambia stood at 124.7%. That is the lowest value across all 8 years on record.

That represents a change of down 35.4% on the previous year and down 52.0% over ten years.

That places Gambia 39th out of 50 countries with data for 2012, putting it in the bottom quarter.

Dealing with construction permits, cost in Gambia, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Gambia, 2005 to 2012.
Year % of income per capita Change
2005 259.9%
2006 238.7% -8.2%
2007 229.2% -4.0%
2008 259.4% +13.2%
2009 221.5% -14.6%
2010 207.3% -6.4%
2011 193.0% -6.9%
2012 124.7% -35.4%

Averages by decade

DecadeAverage LowestHighest Years
2000s 241.7% 221.5% 259.9% 5
2010s 175.0% 124.7% 207.3% 3

Countries ranked near Gambia

  1. 36 Côte d'Ivoire 155.1% compare
  2. 37 Angola 153.6% compare
  3. 38 Egypt 135.0% compare
  4. 40 Equatorial Guinea 120.4% compare
  5. 41 Mozambique 113.3% compare
  6. 42 Namibia 110.9% compare

See the full ranking of 56 places →

More private sector data for Gambia

All data for Gambia →

Frequently asked questions

What is dealing with construction permits, cost in Gambia?
Dealing with construction permits, cost in Gambia was 124.7% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Gambia?
The highest recorded value was 259.9% in 2005.
What is the lowest dealing with construction permits, cost recorded in Gambia?
The lowest recorded value was 124.7% in 2012.
How does Gambia rank for dealing with construction permits, cost?
Gambia ranks 39th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Gambia?
Over the last ten years it is down 52.0%. The long-run trend across the full record is falling.
Where does this Gambia data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Gambia. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 05 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/gambia-the/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/gambia-the/">Dealing with construction permits, cost in Gambia</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.