Egypt vs Mozambique: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Egypt
- Mozambique
How they compare
Egypt currently reports 135.0% against 113.3% in Mozambique, a difference of 21.7%.
That makes Egypt's figure about 1.2 times Mozambique's.
Across all 8 years both countries report, Egypt has been ahead every year.
Egypt ranks 38th and Mozambique ranks 41st of 50 countries.
Egypt has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Egypt | Mozambique | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 481.7% | 219.7% | 262.0% | Egypt |
| 2010s | 154.7% | 129.2% | 25.5% | Egypt |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Egypt or Mozambique?
- Egypt, at 135.0% against 113.3% in Mozambique as of 2012.
- What is the difference in dealing with construction permits, cost between Egypt and Mozambique?
- 21.7%, with Egypt ahead.
- How many years of comparable data are there for Egypt and Mozambique?
- 8 years are reported by both, from 2005 to 2012.
- How do Egypt and Mozambique rank globally for dealing with construction permits, cost?
- Egypt ranks 38th and Mozambique ranks 41st of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.