Dealing with construction permits, cost in Egypt

Egypt: Dealing with construction permits, cost was 135.0% in 2012. ◆ Volatile

Latest (2012)
135.0%
Change on year
down 13.1%
World rank
38th
of 50 countries
All-time high
932.3%
in 2005
All-time low
135.0%
in 2012
Years of data
8
2005–2012

Dealing with construction permits, cost in Egypt, 2005–2012

2004006008001.0k2005200820122005: 932.3 % of income per capita2006: 775 % of income per capita2007: 281.5 % of income per capita2008: 223.4 % of income per capita2009: 196.2 % of income per capita2010: 173.8 % of income per capita2011: 155.3 % of income per capita2012: 135 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

The most recent figure for dealing with construction permits, cost in Egypt is 135.0%, measured in 2012. That is the lowest value across all 8 years on record.

Compared with earlier readings it is down 13.1% on the previous year and down 85.5% over ten years.

That places Egypt 38th out of 50 countries with data for 2012, putting it in the bottom quarter.

Dealing with construction permits, cost in Egypt, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Egypt, 2005 to 2012.
Year % of income per capita Change
2005 932.3%
2006 775.0% -16.9%
2007 281.5% -63.7%
2008 223.4% -20.6%
2009 196.2% -12.2%
2010 173.8% -11.4%
2011 155.3% -10.6%
2012 135.0% -13.1%

Averages by decade

DecadeAverage LowestHighest Years
2000s 481.7% 196.2% 932.3% 5
2010s 154.7% 135.0% 173.8% 3

Countries ranked near Egypt

  1. 35 Benin 167.4% compare
  2. 36 Côte d'Ivoire 155.1% compare
  3. 37 Angola 153.6% compare
  4. 39 Gambia 124.7% compare
  5. 40 Equatorial Guinea 120.4% compare
  6. 41 Mozambique 113.3% compare

See the full ranking of 56 places →

More private sector data for Egypt

All data for Egypt →

Frequently asked questions

What is dealing with construction permits, cost in Egypt?
Dealing with construction permits, cost in Egypt was 135.0% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Egypt?
The highest recorded value was 932.3% in 2005.
What is the lowest dealing with construction permits, cost recorded in Egypt?
The lowest recorded value was 135.0% in 2012.
How does Egypt rank for dealing with construction permits, cost?
Egypt ranks 38th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Egypt?
Over the last ten years it is down 85.5%. The long-run trend across the full record is volatile.
Where does this Egypt data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Egypt. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 04 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/egypt-arab-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/egypt-arab-rep/">Dealing with construction permits, cost in Egypt</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.