Dealing with construction permits, cost in Mozambique

Mozambique: Dealing with construction permits, cost was 113.3% in 2012. ▼ Falling

Latest (2012)
113.3%
Change on year
down 9.6%
World rank
41st
of 50 countries
All-time high
274.8%
in 2005
All-time low
113.3%
in 2012
Years of data
8
2005–2012

Dealing with construction permits, cost in Mozambique, 2005–2012

01002003002005200820122005: 274.8 % of income per capita2006: 237.8 % of income per capita2007: 198.4 % of income per capita2008: 209.9 % of income per capita2009: 177.4 % of income per capita2010: 148.8 % of income per capita2011: 125.4 % of income per capita2012: 113.3 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

In 2012, dealing with construction permits, cost in Mozambique stood at 113.3%. That is the lowest value across all 8 years on record.

That represents a change of down 9.6% on the previous year and down 58.8% over ten years.

Mozambique ranks 41st of 50 countries on this measure, in the bottom quarter.

Dealing with construction permits, cost in Mozambique, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Mozambique, 2005 to 2012.
Year % of income per capita Change
2005 274.8%
2006 237.8% -13.5%
2007 198.4% -16.6%
2008 209.9% +5.8%
2009 177.4% -15.5%
2010 148.8% -16.1%
2011 125.4% -15.7%
2012 113.3% -9.6%

Averages by decade

DecadeAverage LowestHighest Years
2000s 219.7% 177.4% 274.8% 5
2010s 129.2% 113.3% 148.8% 3

Countries ranked near Mozambique

  1. 38 Egypt 135.0% compare
  2. 39 Gambia 124.7% compare
  3. 40 Equatorial Guinea 120.4% compare
  4. 42 Namibia 110.9% compare
  5. 43 Eswatini 94.9% compare
  6. 44 Guinea 94.8% compare

See the full ranking of 56 places →

More private sector data for Mozambique

All data for Mozambique →

Frequently asked questions

What is dealing with construction permits, cost in Mozambique?
Dealing with construction permits, cost in Mozambique was 113.3% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Mozambique?
The highest recorded value was 274.8% in 2005.
What is the lowest dealing with construction permits, cost recorded in Mozambique?
The lowest recorded value was 113.3% in 2012.
How does Mozambique rank for dealing with construction permits, cost?
Mozambique ranks 41st out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Mozambique?
Over the last ten years it is down 58.8%. The long-run trend across the full record is falling.
Where does this Mozambique data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Mozambique. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 03 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/mozambique/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/mozambique/">Dealing with construction permits, cost in Mozambique</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.