Liberia vs Senegal: Dealing with construction permits, cost

Liberia
559.7%
in 2012
Senegal
529.1%
in 2012
Liberia rank
17th
Senegal rank
18th

Dealing with construction permits, cost over time

  • Liberia
  • Senegal
02.0k4.0k6.0k200520082012

How they compare

Liberia currently reports 559.7% against 529.1% in Senegal, a difference of 30.6%.

That makes Liberia's figure about 1.1 times Senegal's.

Across all 7 years both countries report, Liberia has been ahead every year.

Liberia ranks 17th and Senegal ranks 18th of 50 countries.

Liberia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Liberia Senegal Difference Ahead
2000s 4,610.8% 518.6% 4,092.2% Liberia
2010s 692.7% 509.1% 183.6% Liberia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits, cost, Liberia or Senegal?
Liberia, at 559.7% against 529.1% in Senegal as of 2012.
What is the difference in dealing with construction permits, cost between Liberia and Senegal?
30.6%, with Liberia ahead.
How many years of comparable data are there for Liberia and Senegal?
7 years are reported by both, from 2006 to 2012.
How do Liberia and Senegal rank globally for dealing with construction permits, cost?
Liberia ranks 17th and Senegal ranks 18th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Liberia vs Senegal: Dealing with construction permits, cost. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 07 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/liberia/senegal/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/liberia/senegal/">Liberia vs Senegal: Dealing with construction permits, cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.