Dealing with construction permits, cost in Senegal

Senegal: Dealing with construction permits, cost was 529.1% in 2012. ▼ Falling

Latest (2012)
529.1%
Change on year
down 5.3%
World rank
18th
of 50 countries
All-time high
578.0%
in 2006
All-time low
439.6%
in 2010
Years of data
8
2005–2012

Dealing with construction permits, cost in Senegal, 2005–2012

02004006002005200820122005: 558.1 % of income per capita2006: 578 % of income per capita2007: 546.6 % of income per capita2008: 506.2 % of income per capita2009: 443.5 % of income per capita2010: 439.6 % of income per capita2011: 558.7 % of income per capita2012: 529.1 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

Senegal recorded 529.1% for dealing with construction permits, cost in 2012.

That represents a change of down 5.3% on the previous year and down 5.2% over ten years.

That places Senegal 18th out of 50 countries with data for 2012, putting it in the middle of the range.

Dealing with construction permits, cost in Senegal, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Senegal, 2005 to 2012.
Year % of income per capita Change
2005 558.1%
2006 578.0% +3.6%
2007 546.6% -5.4%
2008 506.2% -7.4%
2009 443.5% -12.4%
2010 439.6% -0.9%
2011 558.7% +27.1%
2012 529.1% -5.3%

Averages by decade

DecadeAverage LowestHighest Years
2000s 526.5% 443.5% 578.0% 5
2010s 509.1% 439.6% 558.7% 3

Countries ranked near Senegal

  1. 15 Guinea-Bissau 785.2% compare
  2. 16 Tanzania 564.6% compare
  3. 17 Liberia 559.7% compare
  4. 19 Ghana 481.2% compare
  5. 20 Cape Verde 459.4% compare
  6. 21 Togo 431.5% compare

See the full ranking of 56 places →

More private sector data for Senegal

All data for Senegal →

Frequently asked questions

What is dealing with construction permits, cost in Senegal?
Dealing with construction permits, cost in Senegal was 529.1% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Senegal?
The highest recorded value was 578.0% in 2006.
What is the lowest dealing with construction permits, cost recorded in Senegal?
The lowest recorded value was 439.6% in 2010.
How does Senegal rank for dealing with construction permits, cost?
Senegal ranks 18th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Senegal?
Over the last ten years it is down 5.2%. The long-run trend across the full record is falling.
Where does this Senegal data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Senegal. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 01 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/senegal/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/senegal/">Dealing with construction permits, cost in Senegal</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.