Afghanistan vs Liberia: Dealing with construction permits: Cost

Afghanistan
75.6%
in 2019
Liberia
24.1%
in 2019
Afghanistan rank
1st
Liberia rank
4th

Dealing with construction permits: Cost over time

  • Afghanistan
  • Liberia
050100150200200520122019

How they compare

Afghanistan currently reports 75.6% against 24.1% in Liberia, a difference of 51.5%.

That makes Afghanistan's figure about 3.1 times Liberia's.

The two have swapped places 3 times across 14 shared years of data; in 2006 it was Liberia ahead.

Afghanistan ranks 1st and Liberia ranks 4th of 188 countries.

Across the 2 decades both report, Afghanistan averaged higher in 1 and Liberia in 1.

Head to head by decade

Decade Afghanistan Liberia Difference Ahead
2000s 130.9% 164.9% 33.9% Liberia
2010s 71.1% 44.7% 26.4% Afghanistan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Afghanistan or Liberia?
Afghanistan, at 75.6% against 24.1% in Liberia as of 2019.
What is the difference in dealing with construction permits: cost between Afghanistan and Liberia?
51.5%, with Afghanistan ahead.
How many years of comparable data are there for Afghanistan and Liberia?
14 years are reported by both, from 2006 to 2019.
How do Afghanistan and Liberia rank globally for dealing with construction permits: cost?
Afghanistan ranks 1st and Liberia ranks 4th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Afghanistan vs Liberia: Dealing with construction permits: Cost. Statizoid. Retrieved 02 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/afghanistan/liberia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/afghanistan/liberia/">Afghanistan vs Liberia: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.