Dealing with construction permits: Cost in Afghanistan

Afghanistan: Dealing with construction permits: Cost was 75.6% in 2019. ▼ Falling

Latest (2019)
75.6%
Change on year
up 3.6%
World rank
1st
of 188 countries
All-time high
166.5%
in 2005
All-time low
59.4%
in 2014
Years of data
15
2005–2019

Dealing with construction permits: Cost in Afghanistan, 2005–2019

0501001502005201220192005: 166.5 % of Warehouse value2006: 154.1 % of Warehouse value2007: 160.1 % of Warehouse value2008: 112.5 % of Warehouse value2009: 97.1 % of Warehouse value2010: 85.6 % of Warehouse value2011: 80.5 % of Warehouse value2012: 71.2 % of Warehouse value2013: 66.9 % of Warehouse value2014: 59.4 % of Warehouse value2015: 61.2 % of Warehouse value2016: 66 % of Warehouse value2017: 71.7 % of Warehouse value2018: 73 % of Warehouse value2019: 75.6 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

In 2019, dealing with construction permits: cost in Afghanistan stood at 75.6%.

The figure is up 3.6% on the previous year and down 22.1% over ten years.

Over the whole period, dealing with construction permits: cost in Afghanistan peaked at 166.5% in 2005 and was at its lowest, 59.4%, in 2014.

Afghanistan ranks 1st of 188 countries on this measure, in the top 10%.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Cost in Afghanistan, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Afghanistan, 2005 to 2019.
Year % of Warehouse value Change
2005 166.5%
2006 154.1% -7.4%
2007 160.1% +3.9%
2008 112.5% -29.7%
2009 97.1% -13.7%
2010 85.6% -11.8%
2011 80.5% -6.0%
2012 71.2% -11.6%
2013 66.9% -6.0%
2014 59.4% -11.2%
2015 61.2% +3.0%
2016 66.0% +7.8%
2017 71.7% +8.6%
2018 73.0% +1.8%
2019 75.6% +3.6%

Averages by decade

DecadeAverage LowestHighest Years
2000s 138.1% 97.1% 166.5% 5
2010s 71.1% 59.4% 85.6% 10

Countries ranked near Afghanistan

  1. 2 Madagascar 35.2% compare
  2. 3 Niger 32.4% compare
  3. 4 Liberia 24.1% compare

See the full ranking of 188 places →

More private sector data for Afghanistan

All data for Afghanistan →

Frequently asked questions

What is dealing with construction permits: cost in Afghanistan?
Dealing with construction permits: cost in Afghanistan was 75.6% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Afghanistan?
The highest recorded value was 166.5% in 2005.
What is the lowest dealing with construction permits: cost recorded in Afghanistan?
The lowest recorded value was 59.4% in 2014.
How does Afghanistan rank for dealing with construction permits: cost?
Afghanistan ranks 1st out of 188 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Afghanistan?
Over the last ten years it is down 22.1%. The long-run trend across the full record is falling.
Where does this Afghanistan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Afghanistan. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/afghanistan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/afghanistan/">Dealing with construction permits: Cost in Afghanistan</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.