Dealing with construction permits: Cost in Liberia

Liberia: Dealing with construction permits: Cost was 24.1% in 2019. ◆ Volatile

Latest (2019)
24.1%
Change on year
down 36.7%
World rank
4th
of 187 countries
All-time high
205.6%
in 2007
All-time low
24.1%
in 2019
Years of data
14
2006–2019

Dealing with construction permits: Cost in Liberia, 2006–2019

0501001502002006201220192006: 181.2 % of Warehouse value2007: 205.6 % of Warehouse value2008: 182.6 % of Warehouse value2009: 90.1 % of Warehouse value2010: 94.2 % of Warehouse value2011: 42.1 % of Warehouse value2012: 60.3 % of Warehouse value2013: 39.1 % of Warehouse value2014: 35.3 % of Warehouse value2015: 36.2 % of Warehouse value2016: 38.1 % of Warehouse value2017: 39.1 % of Warehouse value2018: 38.1 % of Warehouse value2019: 24.1 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

In 2019, dealing with construction permits: cost in Liberia stood at 24.1%. That is the lowest value across all 14 years on record.

The figure is down 36.7% on the previous year and down 73.3% over ten years.

Over the whole period, dealing with construction permits: cost in Liberia peaked at 205.6% in 2007 and was at its lowest, 24.1%, in 2019.

Liberia ranks 4th of 187 countries on this measure, in the top 10%.

The series is highly variable year to year, so single readings are best treated with caution.

Dealing with construction permits: Cost in Liberia, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Liberia, 2006 to 2019.
Year % of Warehouse value Change
2006 181.2%
2007 205.6% +13.5%
2008 182.6% -11.2%
2009 90.1% -50.7%
2010 94.2% +4.6%
2011 42.1% -55.3%
2012 60.3% +43.2%
2013 39.1% -35.2%
2014 35.3% -9.7%
2015 36.2% +2.5%
2016 38.1% +5.2%
2017 39.1% +2.6%
2018 38.1% -2.6%
2019 24.1% -36.7%

Averages by decade

DecadeAverage LowestHighest Years
2000s 164.9% 90.1% 205.6% 4
2010s 44.7% 24.1% 94.2% 10

Countries ranked near Liberia

  1. 1 Afghanistan 75.6% compare
  2. 2 Madagascar 35.2% compare
  3. 3 Niger 32.4% compare
  4. 5 Guinea-Bissau 23.7% compare
  5. 6 Central African Republic 23.2% compare
  6. 7 Haiti 21.9% compare

See the full ranking of 187 places →

More private sector data for Liberia

All data for Liberia →

Frequently asked questions

What is dealing with construction permits: cost in Liberia?
Dealing with construction permits: cost in Liberia was 24.1% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Liberia?
The highest recorded value was 205.6% in 2007.
What is the lowest dealing with construction permits: cost recorded in Liberia?
The lowest recorded value was 24.1% in 2019.
How does Liberia rank for dealing with construction permits: cost?
Liberia ranks 4th out of 187 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Liberia?
Over the last ten years it is down 73.3%. The long-run trend across the full record is volatile.
Where does this Liberia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 14 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Liberia. Statizoid. Retrieved 23 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/liberia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/liberia/">Dealing with construction permits: Cost in Liberia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.