Bosnia and Herzegovina vs Central African Republic: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Bosnia and Herzegovina
- Central African Republic
How they compare
Central African Republic currently reports 23.2% against 20.3% in Bosnia and Herzegovina, a difference of 2.9%.
That makes Central African Republic's figure about 1.1 times Bosnia and Herzegovina's.
Across all 15 years both countries report, Central African Republic has been ahead every year.
Bosnia and Herzegovina ranks 9th and Central African Republic ranks 6th of 188 countries.
Central African Republic has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Bosnia and Herzegovina | Central African Republic | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 27.8% | 33.2% | 5.4% | Central African Republic |
| 2010s | 24.8% | 30.6% | 5.9% | Central African Republic |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Bosnia and Herzegovina or Central African Republic?
- Central African Republic, at 23.2% against 20.3% in Bosnia and Herzegovina as of 2019.
- What is the difference in dealing with construction permits: cost between Bosnia and Herzegovina and Central African Republic?
- 2.9%, with Central African Republic ahead.
- How many years of comparable data are there for Bosnia and Herzegovina and Central African Republic?
- 15 years are reported by both, from 2005 to 2019.
- How do Bosnia and Herzegovina and Central African Republic rank globally for dealing with construction permits: cost?
- Bosnia and Herzegovina ranks 9th and Central African Republic ranks 6th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.