Dealing with construction permits: Cost in Central African Republic

Central African Republic: Dealing with construction permits: Cost was 23.2% in 2019. ▼ Falling

Latest (2019)
23.2%
Change on year
down 13.8%
World rank
6th
of 188 countries
All-time high
40.1%
in 2014
All-time low
23.2%
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Cost in Central African Republic, 2005–2019

0102030402005201220192005: 35.2 % of Warehouse value2006: 34.4 % of Warehouse value2007: 33 % of Warehouse value2008: 31.9 % of Warehouse value2009: 31.5 % of Warehouse value2010: 29.1 % of Warehouse value2011: 28.2 % of Warehouse value2012: 29.3 % of Warehouse value2013: 27.2 % of Warehouse value2014: 40.1 % of Warehouse value2015: 35.7 % of Warehouse value2016: 36.8 % of Warehouse value2017: 29.5 % of Warehouse value2018: 26.9 % of Warehouse value2019: 23.2 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

In 2019, dealing with construction permits: cost in Central African Republic stood at 23.2%. That is the lowest value across all 15 years on record.

The figure is down 13.8% on the previous year and down 26.3% over ten years.

Over the whole period, dealing with construction permits: cost in Central African Republic peaked at 40.1% in 2014 and was at its lowest, 23.2%, in 2019.

Central African Republic ranks 6th of 188 countries on this measure, in the top 10%.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Cost in Central African Republic, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Central African Republic, 2005 to 2019.
Year % of Warehouse value Change
2005 35.2%
2006 34.4% -2.3%
2007 33.0% -4.1%
2008 31.9% -3.3%
2009 31.5% -1.3%
2010 29.1% -7.6%
2011 28.2% -3.1%
2012 29.3% +3.9%
2013 27.2% -7.2%
2014 40.1% +47.4%
2015 35.7% -11.0%
2016 36.8% +3.1%
2017 29.5% -19.8%
2018 26.9% -8.8%
2019 23.2% -13.8%

Averages by decade

DecadeAverage LowestHighest Years
2000s 33.2% 31.5% 35.2% 5
2010s 30.6% 23.2% 40.1% 10

Countries ranked near Central African Republic

  1. 3 Niger 32.4% compare
  2. 4 Liberia 24.1% compare
  3. 5 Guinea-Bissau 23.7% compare
  4. 7 Haiti 21.9% compare
  5. 8 Sierra Leone 21.5% compare
  6. 9 Bosnia and Herzegovina 20.3% compare

See the full ranking of 188 places →

More private sector data for Central African Republic

All data for Central African Republic →

Frequently asked questions

What is dealing with construction permits: cost in Central African Republic?
Dealing with construction permits: cost in Central African Republic was 23.2% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Central African Republic?
The highest recorded value was 40.1% in 2014.
What is the lowest dealing with construction permits: cost recorded in Central African Republic?
The lowest recorded value was 23.2% in 2019.
How does Central African Republic rank for dealing with construction permits: cost?
Central African Republic ranks 6th out of 188 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Central African Republic?
Over the last ten years it is down 26.3%. The long-run trend across the full record is falling.
Where does this Central African Republic data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Central African Republic. Statizoid. Retrieved 26 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/central-african-republic/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/central-african-republic/">Dealing with construction permits: Cost in Central African Republic</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.