Dealing with construction permits: Cost in Bosnia and Herzegovina

Bosnia and Herzegovina: Dealing with construction permits: Cost was 20.3% in 2019. ▼ Falling

Latest (2019)
20.3%
Change on year
down 6.0%
World rank
9th
of 188 countries
All-time high
31.2%
in 2008
All-time low
20.3%
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Cost in Bosnia and Herzegovina, 2005–2019

01020302005201220192005: 29.7 % of Warehouse value2006: 27.5 % of Warehouse value2007: 23.8 % of Warehouse value2008: 31.2 % of Warehouse value2009: 26.9 % of Warehouse value2010: 27.3 % of Warehouse value2011: 26.6 % of Warehouse value2012: 26.4 % of Warehouse value2013: 26.3 % of Warehouse value2014: 26 % of Warehouse value2015: 25.6 % of Warehouse value2016: 24.7 % of Warehouse value2017: 22.7 % of Warehouse value2018: 21.6 % of Warehouse value2019: 20.3 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

The most recent figure for dealing with construction permits: cost in Bosnia and Herzegovina is 20.3%, measured in 2019. That is the lowest value across all 15 years on record.

The figure is down 6.0% on the previous year and down 24.5% over ten years.

Over the whole period, dealing with construction permits: cost in Bosnia and Herzegovina peaked at 31.2% in 2008 and was at its lowest, 20.3%, in 2019.

That places Bosnia and Herzegovina 9th out of 188 countries with data for 2019, putting it in the top 10%.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Cost in Bosnia and Herzegovina, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Bosnia and Herzegovina, 2005 to 2019.
Year % of Warehouse value Change
2005 29.7%
2006 27.5% -7.4%
2007 23.8% -13.5%
2008 31.2% +31.1%
2009 26.9% -13.8%
2010 27.3% +1.5%
2011 26.6% -2.6%
2012 26.4% -0.8%
2013 26.3% -0.4%
2014 26.0% -1.1%
2015 25.6% -1.5%
2016 24.7% -3.5%
2017 22.7% -8.1%
2018 21.6% -4.8%
2019 20.3% -6.0%

Averages by decade

DecadeAverage LowestHighest Years
2000s 27.8% 23.8% 31.2% 5
2010s 24.8% 20.3% 27.3% 10

Countries ranked near Bosnia and Herzegovina

  1. 6 Central African Republic 23.2% compare
  2. 7 Haiti 21.9% compare
  3. 8 Sierra Leone 21.5% compare
  4. 10 Solomon Islands 19.7% compare
  5. 11 Chad 18.8% compare
  6. 12 Cameroon 17.6% compare

See the full ranking of 188 places →

More private sector data for Bosnia and Herzegovina

All data for Bosnia and Herzegovina →

Frequently asked questions

What is dealing with construction permits: cost in Bosnia and Herzegovina?
Dealing with construction permits: cost in Bosnia and Herzegovina was 20.3% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Bosnia and Herzegovina?
The highest recorded value was 31.2% in 2008.
What is the lowest dealing with construction permits: cost recorded in Bosnia and Herzegovina?
The lowest recorded value was 20.3% in 2019.
How does Bosnia and Herzegovina rank for dealing with construction permits: cost?
Bosnia and Herzegovina ranks 9th out of 188 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Bosnia and Herzegovina?
Over the last ten years it is down 24.5%. The long-run trend across the full record is falling.
Where does this Bosnia and Herzegovina data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Bosnia and Herzegovina. Statizoid. Retrieved 08 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/bosnia-and-herzegovina/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/bosnia-and-herzegovina/">Dealing with construction permits: Cost in Bosnia and Herzegovina</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.