Central African Republic vs Niger: Dealing with construction permits: Cost

Central African Republic
23.2%
in 2019
Niger
32.4%
in 2019
Central African Republic rank
6th
Niger rank
3rd

Dealing with construction permits: Cost over time

  • Central African Republic
  • Niger
0204060200520122019

How they compare

Niger currently reports 32.4% against 23.2% in Central African Republic, a difference of 9.2%.

That makes Niger's figure about 1.4 times Central African Republic's.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Niger ahead.

Central African Republic ranks 6th and Niger ranks 3rd of 188 countries.

Niger has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Central African Republic Niger Difference Ahead
2000s 33.2% 55.9% 22.7% Niger
2010s 30.6% 40.0% 9.4% Niger

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Central African Republic or Niger?
Niger, at 32.4% against 23.2% in Central African Republic as of 2019.
What is the difference in dealing with construction permits: cost between Central African Republic and Niger?
9.2%, with Niger ahead.
How many years of comparable data are there for Central African Republic and Niger?
15 years are reported by both, from 2005 to 2019.
How do Central African Republic and Niger rank globally for dealing with construction permits: cost?
Central African Republic ranks 6th and Niger ranks 3rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Central African Republic vs Niger: Dealing with construction permits: Cost. Statizoid. Retrieved 31 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/central-african-republic/niger/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/central-african-republic/niger/">Central African Republic vs Niger: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.