Haiti vs Liberia: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Haiti
- Liberia
How they compare
Liberia currently reports 24.1% against 21.9% in Haiti, a difference of 2.2%.
That makes Liberia's figure about 1.1 times Haiti's.
Across all 14 years both countries report, Liberia has been ahead every year.
Haiti ranks 7th and Liberia ranks 4th of 188 countries.
Liberia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Haiti | Liberia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 23.2% | 164.9% | 141.7% | Liberia |
| 2010s | 24.4% | 44.7% | 20.3% | Liberia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Haiti or Liberia?
- Liberia, at 24.1% against 21.9% in Haiti as of 2019.
- What is the difference in dealing with construction permits: cost between Haiti and Liberia?
- 2.2%, with Liberia ahead.
- How many years of comparable data are there for Haiti and Liberia?
- 14 years are reported by both, from 2006 to 2019.
- How do Haiti and Liberia rank globally for dealing with construction permits: cost?
- Haiti ranks 7th and Liberia ranks 4th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.