Haiti vs Sierra Leone: Dealing with construction permits: Cost

Haiti
21.9%
in 2019
Sierra Leone
21.5%
in 2019
Haiti rank
7th
Sierra Leone rank
8th

Dealing with construction permits: Cost over time

  • Haiti
  • Sierra Leone
203040506070200520122019

How they compare

Haiti currently reports 21.9% against 21.5% in Sierra Leone, a difference of 0.4%.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Sierra Leone ahead.

Haiti ranks 7th and Sierra Leone ranks 8th of 188 countries.

Across the 2 decades both report, Haiti averaged higher in 1 and Sierra Leone in 1.

Head to head by decade

Decade Haiti Sierra Leone Difference Ahead
2000s 25.0% 52.3% 27.3% Sierra Leone
2010s 24.4% 24.2% 0.2% Haiti

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Haiti or Sierra Leone?
Haiti, at 21.9% against 21.5% in Sierra Leone as of 2019.
What is the difference in dealing with construction permits: cost between Haiti and Sierra Leone?
0.4%, with Haiti ahead.
How many years of comparable data are there for Haiti and Sierra Leone?
15 years are reported by both, from 2005 to 2019.
How do Haiti and Sierra Leone rank globally for dealing with construction permits: cost?
Haiti ranks 7th and Sierra Leone ranks 8th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Haiti vs Sierra Leone: Dealing with construction permits: Cost. Statizoid. Retrieved 01 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/haiti/sierra-leone/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/haiti/sierra-leone/">Haiti vs Sierra Leone: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.