Dealing with construction permits: Cost in Sierra Leone

Sierra Leone: Dealing with construction permits: Cost was 21.5% in 2019. ▼ Falling

Latest (2019)
21.5%
Change on year
up 0.5%
World rank
8th
of 187 countries
All-time high
65.2%
in 2005
All-time low
16.3%
in 2015
Years of data
15
2005–2019

Dealing with construction permits: Cost in Sierra Leone, 2005–2019

2030405060702005201220192005: 65.2 % of Warehouse value2006: 57.6 % of Warehouse value2007: 53.1 % of Warehouse value2008: 47.2 % of Warehouse value2009: 38.3 % of Warehouse value2010: 36 % of Warehouse value2011: 34.7 % of Warehouse value2012: 34.4 % of Warehouse value2013: 19.9 % of Warehouse value2014: 17 % of Warehouse value2015: 16.3 % of Warehouse value2016: 17.9 % of Warehouse value2017: 22.8 % of Warehouse value2018: 21.4 % of Warehouse value2019: 21.5 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

Sierra Leone recorded 21.5% for dealing with construction permits: cost in 2019.

Compared with earlier readings it is up 0.5% on the previous year and down 43.9% over ten years.

Over the whole period, dealing with construction permits: cost in Sierra Leone peaked at 65.2% in 2005 and was at its lowest, 16.3%, in 2015.

Sierra Leone ranks 8th of 187 countries on this measure, in the top 10%.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Cost in Sierra Leone, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Sierra Leone, 2005 to 2019.
Year % of Warehouse value Change
2005 65.2%
2006 57.6% -11.7%
2007 53.1% -7.8%
2008 47.2% -11.1%
2009 38.3% -18.9%
2010 36.0% -6.0%
2011 34.7% -3.6%
2012 34.4% -0.9%
2013 19.9% -42.2%
2014 17.0% -14.6%
2015 16.3% -4.1%
2016 17.9% +9.8%
2017 22.8% +27.4%
2018 21.4% -6.1%
2019 21.5% +0.5%

Averages by decade

DecadeAverage LowestHighest Years
2000s 52.3% 38.3% 65.2% 5
2010s 24.2% 16.3% 36.0% 10

Countries ranked near Sierra Leone

  1. 5 Guinea-Bissau 23.7% compare
  2. 6 Central African Republic 23.2% compare
  3. 7 Haiti 21.9% compare
  4. 9 Bosnia and Herzegovina 20.3% compare
  5. 10 Solomon Islands 19.7% compare
  6. 11 Chad 18.8% compare

See the full ranking of 187 places →

More private sector data for Sierra Leone

All data for Sierra Leone →

Frequently asked questions

What is dealing with construction permits: cost in Sierra Leone?
Dealing with construction permits: cost in Sierra Leone was 21.5% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Sierra Leone?
The highest recorded value was 65.2% in 2005.
What is the lowest dealing with construction permits: cost recorded in Sierra Leone?
The lowest recorded value was 16.3% in 2015.
How does Sierra Leone rank for dealing with construction permits: cost?
Sierra Leone ranks 8th out of 187 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Sierra Leone?
Over the last ten years it is down 43.9%. The long-run trend across the full record is falling.
Where does this Sierra Leone data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Sierra Leone. Statizoid. Retrieved 22 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/sierra-leone/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/sierra-leone/">Dealing with construction permits: Cost in Sierra Leone</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.