Gabon vs Jordan: Dealing with construction permits (DB16-20 methodology) - Score

Gabon
59.78
in 2019
Jordan
60.33
in 2019
Gabon rank
141st
Jordan rank
138th

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Gabon
  • Jordan
0204060201420162019

How they compare

Jordan currently reports 60.33 against 59.78 in Gabon, a difference of 0.55.

Across all 6 years both countries report, Jordan has been ahead every year.

Gabon ranks 141st and Jordan ranks 138th of 191 countries.

Jordan has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Gabon or Jordan?
Jordan, at 60.33 against 59.78 in Gabon as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Gabon and Jordan?
0.55, with Jordan ahead.
How many years of comparable data are there for Gabon and Jordan?
6 years are reported by both, from 2014 to 2019.
How do Gabon and Jordan rank globally for dealing with construction permits (db16-20 methodology) - score?
Gabon ranks 141st and Jordan ranks 138th of 191 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Gabon vs Jordan: Dealing with construction permits (DB16-20 methodology) - Score. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/gabon/jordan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/gabon/jordan/">Gabon vs Jordan: Dealing with construction permits (DB16-20 methodology) - Score</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.