Honduras vs Moldova: Dealing with construction permits (DB16-20 methodology) - Score

Honduras
56.17
in 2019
Moldova
56.24
in 2019
Honduras rank
157th
Moldova rank
155th

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Honduras
  • Moldova
0204060201420162019

How they compare

Moldova currently reports 56.24 against 56.17 in Honduras, a difference of 0.07.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Honduras ahead.

Honduras ranks 157th and Moldova ranks 155th of 188 countries.

Honduras has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Honduras or Moldova?
Moldova, at 56.24 against 56.17 in Honduras as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Honduras and Moldova?
0.07, with Moldova ahead.
How many years of comparable data are there for Honduras and Moldova?
6 years are reported by both, from 2014 to 2019.
How do Honduras and Moldova rank globally for dealing with construction permits (db16-20 methodology) - score?
Honduras ranks 157th and Moldova ranks 155th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.