Dealing with construction permits (DB16-20 methodology) - Score in Honduras

Honduras: Dealing with construction permits (DB16-20 methodology) - Score was 56.17 in 2019. ▼ Falling

Latest (2019)
56.17
Change on year
up 0.6%
World rank
157th
of 188 countries
All-time high
61.38
in 2014
All-time low
54.3
in 2017
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Honduras, 2014–2019

02040602014201620192014: 61.42015: 60.92016: 582017: 54.32018: 55.82019: 56.2

Source: World Bank.

Analysis

Honduras recorded 56.17 for dealing with construction permits (db16-20 methodology) - score in 2019.

The figure is up 0.6% on the previous year and down 8.5% over ten years.

Honduras ranks 157th of 188 countries on this measure, in the bottom quarter.

Countries ranked near Honduras

  1. 154 Argentina 56.44 compare
  2. 155 Moldova 56.24 compare
  3. 156 Czechia 56.21 compare
  4. 158 Timor-Leste 55.29 compare
  5. 159 Burundi 55.01 compare
  6. 160 Equatorial Guinea 55.01 compare

See the full ranking of 190 places →

More private sector data for Honduras

All data for Honduras →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Honduras?
Dealing with construction permits (db16-20 methodology) - score in Honduras was 56.17 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Honduras?
The highest recorded value was 61.38 in 2014.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Honduras?
The lowest recorded value was 54.3 in 2017.
How does Honduras rank for dealing with construction permits (db16-20 methodology) - score?
Honduras ranks 157th out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Honduras?
Over the last ten years it is down 8.5%. The long-run trend across the full record is falling.
Where does this Honduras data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.