Hong Kong vs United Arab Emirates: Dealing with construction permits (DB16-20 methodology) - Score

Hong Kong
93.47
in 2019
United Arab Emirates
89.75
in 2019
Hong Kong rank
1st
United Arab Emirates rank
3rd

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Hong Kong
  • United Arab Emirates
020406080100201420162019

How they compare

Hong Kong currently reports 93.47 against 89.75 in United Arab Emirates, a difference of 3.72.

Across all 6 years both countries report, Hong Kong has been ahead every year.

Hong Kong ranks 1st and United Arab Emirates ranks 3rd of 191 countries.

Hong Kong has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Hong Kong or United Arab Emirates?
Hong Kong, at 93.47 against 89.75 in United Arab Emirates as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Hong Kong and United Arab Emirates?
3.72, with Hong Kong ahead.
How many years of comparable data are there for Hong Kong and United Arab Emirates?
6 years are reported by both, from 2014 to 2019.
How do Hong Kong and United Arab Emirates rank globally for dealing with construction permits (db16-20 methodology) - score?
Hong Kong ranks 1st and United Arab Emirates ranks 3rd of 191 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Hong Kong vs United Arab Emirates: Dealing with construction permits (DB16-20 methodology) - Score. Statizoid. Retrieved 29 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/hong-kong-sar-china/united-arab-emirates/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/hong-kong-sar-china/united-arab-emirates/">Hong Kong vs United Arab Emirates: Dealing with construction permits (DB16-20 methodology) - Score</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.