Kiribati vs Solomon Islands: Dealing with construction permits (DB16-20 methodology) - Score

Kiribati
52.2
in 2019
Solomon Islands
49.47
in 2019
Kiribati rank
167th
Solomon Islands rank
170th

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Kiribati
  • Solomon Islands
0204060201420162019

How they compare

Kiribati currently reports 52.2 against 49.47 in Solomon Islands, a difference of 2.73.

That makes Kiribati's figure about 1.1 times Solomon Islands's.

The two have swapped places 3 times across 6 shared years of data; in 2014 it was Solomon Islands ahead.

Kiribati ranks 167th and Solomon Islands ranks 170th of 188 countries.

Kiribati has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Kiribati or Solomon Islands?
Kiribati, at 52.2 against 49.47 in Solomon Islands as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Kiribati and Solomon Islands?
2.73, with Kiribati ahead.
How many years of comparable data are there for Kiribati and Solomon Islands?
6 years are reported by both, from 2014 to 2019.
How do Kiribati and Solomon Islands rank globally for dealing with construction permits (db16-20 methodology) - score?
Kiribati ranks 167th and Solomon Islands ranks 170th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.