Dealing with construction permits (DB16-20 methodology) - Score in Solomon Islands
Solomon Islands: Dealing with construction permits (DB16-20 methodology) - Score was 49.47 in 2019. ▬ Flat
Dealing with construction permits (DB16-20 methodology) - Score in Solomon Islands, 2014–2019
Source: World Bank.
Analysis
Solomon Islands recorded 49.47 for dealing with construction permits (db16-20 methodology) - score in 2019. That is the highest value across all 6 years on record.
The figure is up 0.8% on the previous year and up 2.5% over ten years.
That places Solomon Islands 170th out of 188 countries with data for 2019, putting it in the bottom quarter.
Countries ranked near Solomon Islands
More private sector data for Solomon Islands
- Merchandise trade 83.8% (2025)
- Food imports 22.2% (2018)
- Manufactures imports 59.9% (2018)
- Merchandise imports 790.00 million current US$ (2025)
- Food exports 20.1% (2018)
- Manufactures exports 2.2% (2018)
- Merchandise exports 677.00 million current US$ (2025)
- Commercial service exports 122.73 million current US$ (2024)
- Transport services 32.8% (2024)
- Computer, communications and other services 44.8% (2024)
Frequently asked questions
- What is dealing with construction permits (db16-20 methodology) - score in Solomon Islands?
- Dealing with construction permits (db16-20 methodology) - score in Solomon Islands was 49.47 in 2019, according to the World Bank.
- What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Solomon Islands?
- The highest recorded value was 49.47 in 2019.
- What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Solomon Islands?
- The lowest recorded value was 48.24 in 2014.
- How does Solomon Islands rank for dealing with construction permits (db16-20 methodology) - score?
- Solomon Islands ranks 170th out of 188 countries with data for 2019.
- Is dealing with construction permits (db16-20 methodology) - score rising or falling in Solomon Islands?
- Over the last ten years it is up 2.5%. The long-run trend across the full record is flat.
- Where does this Solomon Islands data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.