Dealing with construction permits (DB16-20 methodology) - Score in Solomon Islands

Solomon Islands: Dealing with construction permits (DB16-20 methodology) - Score was 49.47 in 2019. ▬ Flat

Latest (2019)
49.47
Change on year
up 0.8%
World rank
170th
of 188 countries
All-time high
49.47
in 2019
All-time low
48.24
in 2014
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Solomon Islands, 2014–2019

010203040502014201620192014: 48.22015: 48.22016: 48.22017: 49.12018: 49.12019: 49.5

Source: World Bank.

Analysis

Solomon Islands recorded 49.47 for dealing with construction permits (db16-20 methodology) - score in 2019. That is the highest value across all 6 years on record.

The figure is up 0.8% on the previous year and up 2.5% over ten years.

That places Solomon Islands 170th out of 188 countries with data for 2019, putting it in the bottom quarter.

Countries ranked near Solomon Islands

  1. 167 Kiribati 52.2 compare
  2. 168 Brazil 51.92 compare
  3. 169 South Sudan 50.51 compare
  4. 171 Bosnia and Herzegovina 48.57 compare
  5. 172 Chad 47.24 compare
  6. 173 Venezuela 46.45 compare

See the full ranking of 190 places →

More private sector data for Solomon Islands

All data for Solomon Islands →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Solomon Islands?
Dealing with construction permits (db16-20 methodology) - score in Solomon Islands was 49.47 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Solomon Islands?
The highest recorded value was 49.47 in 2019.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Solomon Islands?
The lowest recorded value was 48.24 in 2014.
How does Solomon Islands rank for dealing with construction permits (db16-20 methodology) - score?
Solomon Islands ranks 170th out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Solomon Islands?
Over the last ten years it is up 2.5%. The long-run trend across the full record is flat.
Where does this Solomon Islands data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.