South Korea vs Serbia: Dealing with construction permits (DB16-20 methodology) - Score
Dealing with construction permits (DB16-20 methodology) - Score over time
- South Korea
- Serbia
How they compare
Serbia currently reports 85.29 against 84.44 in South Korea, a difference of 0.85.
The two have swapped places 1 time across 6 shared years of data; in 2014 it was South Korea ahead.
South Korea ranks 12th and Serbia ranks 9th of 188 countries.
South Korea has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits (db16-20 methodology) - score, South Korea or Serbia?
- Serbia, at 85.29 against 84.44 in South Korea as of 2019.
- What is the difference in dealing with construction permits (db16-20 methodology) - score between South Korea and Serbia?
- 0.85, with Serbia ahead.
- How many years of comparable data are there for South Korea and Serbia?
- 6 years are reported by both, from 2014 to 2019.
- How do South Korea and Serbia rank globally for dealing with construction permits (db16-20 methodology) - score?
- South Korea ranks 12th and Serbia ranks 9th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.