Malawi vs Palau: Dealing with construction permits (DB16-20 methodology) - Score

Malawi
63.13
in 2019
Palau
63.1
in 2019
Malawi rank
128th
Palau rank
129th

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Malawi
  • Palau
0204060201420162019

How they compare

Malawi currently reports 63.13 against 63.1 in Palau, a difference of 0.03.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Palau ahead.

Malawi ranks 128th and Palau ranks 129th of 191 countries.

Palau has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Malawi or Palau?
Malawi, at 63.13 against 63.1 in Palau as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Malawi and Palau?
0.03, with Malawi ahead.
How many years of comparable data are there for Malawi and Palau?
6 years are reported by both, from 2014 to 2019.
How do Malawi and Palau rank globally for dealing with construction permits (db16-20 methodology) - score?
Malawi ranks 128th and Palau ranks 129th of 191 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Malawi vs Palau: Dealing with construction permits (DB16-20 methodology) - Score. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/malawi/palau/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/malawi/palau/">Malawi vs Palau: Dealing with construction permits (DB16-20 methodology) - Score</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.