Malta vs Saint Kitts and Nevis: Dealing with construction permits (DB16-20 methodology) - Score

Malta
73.49
in 2019
Saint Kitts and Nevis
73.48
in 2019
Malta rank
57th
Saint Kitts and Nevis rank
58th

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Malta
  • Saint Kitts and Nevis
020406080201420162019

How they compare

Malta currently reports 73.49 against 73.48 in Saint Kitts and Nevis, a difference of 0.01.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Saint Kitts and Nevis ahead.

Malta ranks 57th and Saint Kitts and Nevis ranks 58th of 190 countries.

Saint Kitts and Nevis has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Malta or Saint Kitts and Nevis?
Malta, at 73.49 against 73.48 in Saint Kitts and Nevis as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Malta and Saint Kitts and Nevis?
0.01, with Malta ahead.
How many years of comparable data are there for Malta and Saint Kitts and Nevis?
6 years are reported by both, from 2014 to 2019.
How do Malta and Saint Kitts and Nevis rank globally for dealing with construction permits (db16-20 methodology) - score?
Malta ranks 57th and Saint Kitts and Nevis ranks 58th of 190 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Malta vs Saint Kitts and Nevis: Dealing with construction permits (DB16-20 methodology) - Score. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/malta/st-kitts-and-nevis/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/malta/st-kitts-and-nevis/">Malta vs Saint Kitts and Nevis: Dealing with construction permits (DB16-20 methodology) - Score</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.