Dealing with construction permits (DB16-20 methodology) - Score in Saint Kitts and Nevis

Saint Kitts and Nevis: Dealing with construction permits (DB16-20 methodology) - Score was 73.48 in 2019. ▬ Flat

Latest (2019)
73.48
Change on year
up 0.1%
World rank
58th
of 188 countries
All-time high
73.48
in 2019
All-time low
73.29
in 2014
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Saint Kitts and Nevis, 2014–2019

0204060802014201620192014: 73.32015: 73.32016: 73.42017: 73.42018: 73.42019: 73.5

Source: World Bank.

Analysis

Saint Kitts and Nevis recorded 73.48 for dealing with construction permits (db16-20 methodology) - score in 2019. That is the highest value across all 6 years on record.

The figure is up 0.1% on the previous year and up 0.3% over ten years.

That places Saint Kitts and Nevis 58th out of 188 countries with data for 2019, putting it in the middle of the range.

Countries ranked near Saint Kitts and Nevis

  1. 55 Nigeria 73.61 compare
  2. 56 Latvia 73.51 compare
  3. 57 Malta 73.49 compare
  4. 59 Azerbaijan 73.36 compare
  5. 60 Portugal 73.23 compare
  6. 61 Mozambique 73.19 compare

See the full ranking of 190 places →

More private sector data for Saint Kitts and Nevis

All data for Saint Kitts and Nevis →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Saint Kitts and Nevis?
Dealing with construction permits (db16-20 methodology) - score in Saint Kitts and Nevis was 73.48 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Saint Kitts and Nevis?
The highest recorded value was 73.48 in 2019.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Saint Kitts and Nevis?
The lowest recorded value was 73.29 in 2014.
How does Saint Kitts and Nevis rank for dealing with construction permits (db16-20 methodology) - score?
Saint Kitts and Nevis ranks 58th out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Saint Kitts and Nevis?
Over the last ten years it is up 0.3%. The long-run trend across the full record is flat.
Where does this Saint Kitts and Nevis data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.