Moldova vs East Timor: Dealing with construction permits (DB16-20 methodology) - Score

Moldova
56.24
in 2019
East Timor
55.29
in 2019
Moldova rank
155th
East Timor rank
158th

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Moldova
  • East Timor
0204060201420162019

How they compare

Moldova currently reports 56.24 against 55.29 in East Timor, a difference of 0.95.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was East Timor ahead.

Moldova ranks 155th and East Timor ranks 158th of 188 countries.

East Timor has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Moldova or East Timor?
Moldova, at 56.24 against 55.29 in East Timor as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Moldova and East Timor?
0.95, with Moldova ahead.
How many years of comparable data are there for Moldova and East Timor?
6 years are reported by both, from 2014 to 2019.
How do Moldova and East Timor rank globally for dealing with construction permits (db16-20 methodology) - score?
Moldova ranks 155th and East Timor ranks 158th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.