Dealing with construction permits (DB16-20 methodology) - Score in East Timor
East Timor: Dealing with construction permits (DB16-20 methodology) - Score was 55.29 in 2019. ▬ Flat
Dealing with construction permits (DB16-20 methodology) - Score in East Timor, 2014–2019
Source: World Bank.
Analysis
East Timor recorded 55.29 for dealing with construction permits (db16-20 methodology) - score in 2019.
That represents a change of down 0.1% on the previous year and down 0.6% over ten years.
That places East Timor 158th out of 188 countries with data for 2019, putting it in the bottom quarter.
Countries ranked near East Timor
More private sector data for East Timor
- Merchandise trade 56.9% (2025)
- Food imports 28.1% (2023)
- Manufactures imports 49.6% (2023)
- Merchandise imports 979.00 million current US$ (2025)
- Food exports 10.5% (2023)
- Manufactures exports 21.9% (2023)
- Merchandise exports 103.00 million current US$ (2025)
- Commercial service exports 132.58 million current US$ (2025)
- Transport services 31.3% (2025)
- Computer, communications and other services 11.4% (2025)
Frequently asked questions
- What is dealing with construction permits (db16-20 methodology) - score in East Timor?
- Dealing with construction permits (db16-20 methodology) - score in East Timor was 55.29 in 2019, according to the World Bank.
- What is the highest dealing with construction permits (db16-20 methodology) - score recorded in East Timor?
- The highest recorded value was 55.64 in 2014.
- What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in East Timor?
- The lowest recorded value was 55.29 in 2017.
- How does East Timor rank for dealing with construction permits (db16-20 methodology) - score?
- East Timor ranks 158th out of 188 countries with data for 2019.
- Is dealing with construction permits (db16-20 methodology) - score rising or falling in East Timor?
- Over the last ten years it is down 0.6%. The long-run trend across the full record is flat.
- Where does this East Timor data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.