Niger vs Sierra Leone: Dealing with construction permits (DB16-20 methodology) - Score

Niger
44.15
in 2019
Sierra Leone
38.43
in 2019
Niger rank
178th
Sierra Leone rank
179th

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Niger
  • Sierra Leone
010203040201420162019

How they compare

Niger currently reports 44.15 against 38.43 in Sierra Leone, a difference of 5.72.

That makes Niger's figure about 1.1 times Sierra Leone's.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Sierra Leone ahead.

Niger ranks 178th and Sierra Leone ranks 179th of 188 countries.

Niger has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Niger or Sierra Leone?
Niger, at 44.15 against 38.43 in Sierra Leone as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Niger and Sierra Leone?
5.72, with Niger ahead.
How many years of comparable data are there for Niger and Sierra Leone?
6 years are reported by both, from 2014 to 2019.
How do Niger and Sierra Leone rank globally for dealing with construction permits (db16-20 methodology) - score?
Niger ranks 178th and Sierra Leone ranks 179th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.