Dealing with construction permits (DB16-20 methodology) - Score in Sierra Leone

Sierra Leone: Dealing with construction permits (DB16-20 methodology) - Score was 38.43 in 2019. ▼ Falling

Latest (2019)
38.43
Change on year
unchanged
World rank
182nd
of 191 countries
All-time high
43.08
in 2015
All-time low
38.43
in 2017
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Sierra Leone, 2014–2019

0102030402014201620192014: 42.12015: 43.12016: 41.12017: 38.42018: 38.42019: 38.4

Source: World Bank.

Analysis

In 2019, dealing with construction permits (db16-20 methodology) - score in Sierra Leone stood at 38.43. That is the lowest value across all 6 years on record.

Compared with earlier readings it is down 8.8% over ten years.

Sierra Leone ranks 182nd of 191 countries on this measure, in the bottom quarter.

Dealing with construction permits (DB16-20 methodology) - Score in Sierra Leone, year by year

Annual values for Dealing with construction permits (DB16-20 methodology) - Score in Sierra Leone, 2014 to 2019.
Year Value Change
2014 42.15 —
2015 43.08 +2.2%
2016 41.05 -4.7%
2017 38.43 -6.4%
2018 38.43 +0.0%
2019 38.43 +0.0%

Sierra Leone compared with similar countries

  • Sierra Leone's 38.43 is below the median for low income countries, which is 48.88, 79% of the median. (24 countries reporting)
  • Sierra Leone's 38.43 is below the median for Sub-Saharan Africa, which is 62.6, 61% of the median. (48 countries reporting)

Countries ranked near Sierra Leone

  1. 179 Cambodia 44.55 compare
  2. 180 Haiti 44.22 compare
  3. 181 Niger 44.15 compare
  4. 183 Madagascar 35.9 compare
  5. 184 Afghanistan 34.54 compare
  6. 185 Central African Republic 34.1 compare

See the full ranking of 191 places →

More private sector data for Sierra Leone

All data for Sierra Leone →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Sierra Leone?
Dealing with construction permits (db16-20 methodology) - score in Sierra Leone was 38.43 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Sierra Leone?
The highest recorded value was 43.08 in 2015.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Sierra Leone?
The lowest recorded value was 38.43 in 2017.
How does Sierra Leone rank for dealing with construction permits (db16-20 methodology) - score?
Sierra Leone ranks 182nd out of 191 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Sierra Leone?
Over the last ten years it is down 8.8%. The long-run trend across the full record is falling.
Where does this Sierra Leone data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB16-20 methodology) - Score in Sierra Leone. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/sierra-leone/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/sierra-leone/">Dealing with construction permits (DB16-20 methodology) - Score in Sierra Leone</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.