Equatorial Guinea vs Samoa: Dealing with construction permits: Quality control after construction

Equatorial Guinea
0 DB16-20 methodology
in 2019
Samoa
0 DB16-20 methodology
in 2019
Equatorial Guinea rank
176th
Samoa rank
176th

Dealing with construction permits: Quality control after construction over time

  • Equatorial Guinea
  • Samoa
00.20.40.60.81201420162019

How they compare

Equatorial Guinea currently reports 0 DB16-20 methodology against 0 DB16-20 methodology in Samoa, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Samoa has been ahead every year.

Equatorial Guinea ranks 176th and Samoa ranks 176th of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Equatorial Guinea or Samoa?
Equatorial Guinea, at 0 DB16-20 methodology against 0 DB16-20 methodology in Samoa as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Equatorial Guinea and Samoa?
0 DB16-20 methodology, with Equatorial Guinea ahead.
How many years of comparable data are there for Equatorial Guinea and Samoa?
6 years are reported by both, from 2014 to 2019.
How do Equatorial Guinea and Samoa rank globally for dealing with construction permits: quality control after construction?
Equatorial Guinea ranks 176th and Samoa ranks 176th of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.