Dealing with construction permits: Quality control after construction in Equatorial Guinea
Equatorial Guinea: Dealing with construction permits: Quality control after construction was 0 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control after construction in Equatorial Guinea, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: quality control after construction in Equatorial Guinea stood at 0 DB16-20 methodology. That is the highest value across all 6 years on record.
That places Equatorial Guinea 176th out of 183 countries with data for 2019, putting it in the bottom quarter.
Countries ranked near Equatorial Guinea
- 176 Afghanistan 0 DB16-20 methodology compare
- 176 Liberia 0 DB16-20 methodology compare
- 176 Maldives 0 DB16-20 methodology compare
- 176 Marshall Islands 0 DB16-20 methodology compare
- 176 Micronesia (country) 0 DB16-20 methodology compare
- 176 Nicaragua 0 DB16-20 methodology compare
- 176 Samoa 0 DB16-20 methodology compare
More private sector data for Equatorial Guinea
- Merchandise trade 33.5% (2025)
- Food imports 31.8% (1983)
- Manufactures imports 64.2% (1983)
- Merchandise imports 1.70 billion current US$ (2025)
- Food exports 57.9% (1983)
- Manufactures exports 4.0% (1983)
- Merchandise exports 2.60 billion current US$ (2025)
- Commercial service exports 4.88 million current US$ (1996)
- Commercial service imports 184.58 million current US$ (1996)
- Merchandise imports from economies in the Arab World 2.9% (2023)
Frequently asked questions
- What is dealing with construction permits: quality control after construction in Equatorial Guinea?
- Dealing with construction permits: quality control after construction in Equatorial Guinea was 0 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control after construction recorded in Equatorial Guinea?
- The highest recorded value was 0 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control after construction recorded in Equatorial Guinea?
- The lowest recorded value was 0 DB16-20 methodology in 2014.
- How does Equatorial Guinea rank for dealing with construction permits: quality control after construction?
- Equatorial Guinea ranks 176th out of 183 countries with data for 2019.
- Where does this Equatorial Guinea data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.