Maldives vs Samoa: Dealing with construction permits: Quality control after construction
Maldives
0 DB16-20 methodology
in 2019
Samoa
0 DB16-20 methodology
in 2019
Maldives rank
178th
Samoa rank
178th
Dealing with construction permits: Quality control after construction over time
- Maldives
- Samoa
How they compare
Maldives currently reports 0 DB16-20 methodology against 0 DB16-20 methodology in Samoa, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Samoa has been ahead every year.
Maldives ranks 178th and Samoa ranks 178th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Maldives or Samoa?
- Maldives, at 0 DB16-20 methodology against 0 DB16-20 methodology in Samoa as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Maldives and Samoa?
- 0 DB16-20 methodology, with Maldives ahead.
- How many years of comparable data are there for Maldives and Samoa?
- 6 years are reported by both, from 2014 to 2019.
- How do Maldives and Samoa rank globally for dealing with construction permits: quality control after construction?
- Maldives ranks 178th and Samoa ranks 178th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.